Newcrest Mining Limited, Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert (s46)

Project
Proposal description: 

Inquiry under section 46 of the Environmental Protection Act 1986 to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. 

Assessment Number: 
1518
Region: 
Referred under EP Act: 
s46
Industry sector: 
Last updated: 
May 27, 2004
Current Status: 
Ministerial Statement published