ProjectProponent: Newcrest Mining LimitedProposal description: Inquiry under section 46 of the Environmental Protection Act 1986 to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. Assessment Number: 1518Region: PerthReferred under EP Act: s46Industry sector: InfrastructureLast updated: May 27, 2004Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: s46 request for a change to environmental conditions (not subject to appeal): Public NotificationPreliminary Environmental Factors: Terrestrial FaunaDate published: Monday, 22 March, 2004 4. EPA Report on assessmentEPA Report Number: 1127EPA Report: EPA Bulletin 1127 (PDF, 89.46 KB)Key Environmental Factors: Terrestrial FaunaDate published: Monday, 22 March, 2004Appeals close: Monday, 5 April, 2004 5. Decision on proposal and implementation of proposalMinisterial StatementComments: This Statement amends Ministerial Statement 605. Date of approval: Thursday, 27 May, 2004Ministerial Statement: Ministerial Statement 650 (PDF, 49.46 KB)