Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (1) Apply Iron Ore filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (6) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter

Filter by relevant environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Hydrological Processes (5) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Inland Waters (2) Apply Inland Waters filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • 37 (1) Apply 37 filter

Filter by Proponent:

  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Water Corporation (2) Apply Water Corporation filter
  • DBNGP (WA) Nominees Pty Limited (1) Apply DBNGP (WA) Nominees Pty Limited filter
  • FMG (1) Apply FMG filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Pilbara Energy Company Pty Ltd (1) Apply Pilbara Energy Company Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Perth (2) Apply Perth filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Peel (1) Apply Peel filter
  • South West (1) Apply South West filter

Filter by last updated:

  • (-) Remove 2019 filter 2019
  1. Home
  2. Proposal search
  3. Infrastructure
  4. Flora and Vegetation
  5. 2019

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Perth Seawater Desalination Plant 2

Last updated: November 25, 2019

The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...

Perth-Darwin National Highway (Swan Valley section) (s46) [2188]

Last updated: November 20, 2019

Remove reference to Claypans of the Swan Coastal Plain and remove requirement to vest land with the Conservation and Parks Commission. Read more...

Kemerton wastewater treatment plant and treated wastewater reuse at woodlot

Last updated: October 1, 2019

The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...

Eliwana Railway Project

Last updated: August 14, 2019

Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...

Christmas Creek Iron Ore Mine Expansion

Last updated: July 8, 2019

The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Pilbara Transmission Project

Last updated: March 5, 2019

Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure.  The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...

Dampier to Bunbury Natural Gas Pipeline (DBNGP) to Albemarle Lithium Plant Gas Pipeline Proposal

Last updated: March 5, 2019

DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline.  The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...

Coastal Road from Lancelin to Cervantes

Last updated: January 7, 2019

Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.