This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: April 4, 2012
The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: March 28, 2012
The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...Last updated: March 28, 2012
The proposal is to mine high-grade detrital iron ore from Hamersley Iron's leases on Mt Brockman station. The deposits lie at the foot of the Brockman massif some 3km from Mt Brockman and 55 km north-west of Tom Price. Ore will be extracted from one pit 1500 metres long by 500 metres wide and up to three smaller pits of about 500 metres by 200 metres. Open cut mining methods would be used, involving the stockpiling of topsoil and about 5 million tonnes of waste overburden per year, then... Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: February 28, 2012
Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 16, 2011
Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: June 2, 2011
Inquiry under s46 to amend condition 5-1 of Ministerial Statement 847 . Read more...Last updated: March 24, 2011
Proposal to deepen the Fremantle Inner Harbour, Entrance Channel and the Deep Water Channel, and further reclamation at Rous Head by Fremantle Ports. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: January 19, 2011
Inquiry under s46 into a request to change the conditions of Ministerial Statement 757 . Read more...Last updated: December 3, 2010
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Read more...