This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 29, 2025
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...Last updated: January 29, 2025
Change Condition 3 to extend the time limit of authorisation for substantial commencement of the proposal Read more...Last updated: November 25, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: December 21, 2017
The proposal is for clearing of access tracks and clearing, leveling and cut and fill of drill pads for exploration drilling on the Mungada Ridge of the Midwest Region of Western Australia. Read more...Last updated: December 21, 2017
Proposal by Sinosteel Midwest Corporation Limited to mine hematite ore at Koolanooka Hills and at two locations at Mungada (part of the Blue Hills Range), to reinstate the Mungada Haul Road to its original width and construct an accommodation camp at Old Karara Homestead. Read more...Last updated: December 13, 2017
The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...Last updated: June 28, 2017
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. The EPA set the level of assessment on the Blue Hills Mungada East Expansion Project by Sinosteel Midwest Corporation, as an Assessment on Proponent Information, category B (environmentally unacceptable). Following the... Read more...Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...Last updated: June 4, 2014
To develop and operate an iron ore mine, supporting infrastructure and a haul road, 76 km north-east of Perenjori in the Midwest region. Read more...Last updated: March 12, 2014
The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond. Read more...Last updated: August 15, 2013
Construct and operate a shallow open pit iron ore mine and associated infrastructure on the Mt Gibson Pastoral Lease in the Mid-West of Western Australia. Read more...Last updated: May 4, 2012
Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 805 . Read more...Last updated: February 28, 2012
The proposal is to mine and process iron ore from Extension Hill and Extension Hill North, within the Mt Gibson Ranges, construct a pipeline to transport the magnetite slurry to Geraldton Port, and construct infrastructure at the port to strip the ore from the slurry for export. Inquiry under s46 in regard to amending the conditions of Ministerial Statement 753 . Read more...Last updated: February 28, 2012
Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 12, 1997
The proposal is to establish the Geraldton Steel Plant (GSP) at Oakajee, 23km north of Geraldton. The GSP will be located within the planned Oakajee Industrial Estate in the Shire of Chapman Valley. The proposal will consist of the following main components: a pellet plant in which the majority of iron ore is converted to pellets suitable for direct reduction; two direct reduction plants for the reduction of pelletised iron ore to direct reduced iron; three electric arc furnaces and tlu·ee... Read more...Last updated: October 13, 1997
The proposal is to to increase the production of Kingstream Resources' recently assessed Mid West Iron & Steel Project Geraldton Steel Plant (GSP), at the Narngulu Industrial Estate south-east of Geraldton, from 1.0 Mt/a to 2.4 Mt/a. Changes are also proposed to the product, specifically that slab steel be produced rather than rolled coil, with resulting changes in the requirement for major plant. Read more...