ProjectProponent: Top Iron Pty LtdProposal description: Construct and operate a shallow open pit iron ore mine and associated infrastructure on the Mt Gibson Pastoral Lease in the Mid-West of Western Australia. Assessment Number: 1952Region: Mid WestReferred under EP Act: s38Industry sector: Iron OreLast updated: August 15, 2013Current Status: Ministerial Statement published 1. ReferralReferral documentation: Appendix Referral Form (PDF, 114.97 KB) Appendix 1 Table of contents (PDF, 22.59 KB) Appendix 2 Flora survey (PDF, 2.03 MB) Appendix 3 Fauna Survey (PDF, 2.88 MB) Appendix 4 Malleefowl (PDF, 2.1 MB) Appendix 5 Fauna habitat assessment (PDF, 2.26 MB) Appendix 6 Subterranean Fauna Assessment (PDF, 3.54 MB) Appendix 7 Short Range Endemic Invertebrate Assessment (PDF, 5.55 MB) Appendix 8 Hydrology Study (PDF, 5.52 MB) Appendix 9 Geochemical assessment (PDF, 602.69 KB) Appendix 10 Summary of Consultation (PDF, 30.02 KB) Appendix 11 Summary of Consultation (PDF, 4.06 MB) 2. Decision on whether to assess this proposalChair's Determination: Assess - Assessment on Proponent Information - Category AExtract of determination: Chaiman's Determination - Mummaloo Iron Ore Project (PDF, 21.94 KB)Preliminary Environmental Factors: Flora and VegetationTerrestrial FaunaDate published: Monday, 3 December, 2012 4. EPA Report on assessmentEPA Report Number: 1485EPA Report: Report 1485 - Mummaloo Iron Ore Project (PDF, 1.34 MB)Proponent documents: Environmental Review Document - Mummaloo Iron Ore Project (PDF, 1001.96 KB) Mummaloo Iron Ore Project API Appendices (ZIP, 39.37 MB) Appendix 2 Combined figures (PDF, 1.97 MB)Key Environmental Factors: Flora and VegetationTerrestrial FaunaDate published: Monday, 8 July, 2013Appeals close: Monday, 22 July, 2013 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Thursday, 15 August, 2013Ministerial Statement: Ministerial Statement 943 - Mummaloo Iron Ore Project (PDF, 1.16 MB)