This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 28, 2012
The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...Last updated: March 28, 2012
The proposal is to mine high-grade detrital iron ore from Hamersley Iron's leases on Mt Brockman station. The deposits lie at the foot of the Brockman massif some 3km from Mt Brockman and 55 km north-west of Tom Price. Ore will be extracted from one pit 1500 metres long by 500 metres wide and up to three smaller pits of about 500 metres by 200 metres. Open cut mining methods would be used, involving the stockpiling of topsoil and about 5 million tonnes of waste overburden per year, then... Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: February 28, 2012
The proposal is to mine and process iron ore from Extension Hill and Extension Hill North, within the Mt Gibson Ranges, construct a pipeline to transport the magnetite slurry to Geraldton Port, and construct infrastructure at the port to strip the ore from the slurry for export. Inquiry under s46 in regard to amending the conditions of Ministerial Statement 753 . Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: February 28, 2012
Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...Last updated: February 13, 2012
The proposal is to excavate and process gypsum ore and overburden from mining lease 70/1161. Inquiry under s46 to amend condition 8.1 of Ministerial Statement 730 . Read more...Last updated: February 7, 2012
Inquiry under s46 in regard to amendment of conditions of Ministerial Statement 0399 Busselton Regional Aerodrome. Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: January 5, 2012
The proposal is to increase production of barramundi from 1000 tpa to 2000 tpa at its sea cage aquaculture site in Cone Bay which is located approximately 215 km north north east of Broome in the Buccaneer Archipelago and forms part of the Yampi Sound in the Kimberley region of Western Australia. The proponent has a 21 year Aquaculture Lease (AL0020) over its existing aquaculture site (Aquaculture Licence No. 1465) which is approximately 700 hectares. Read more...Last updated: December 15, 2011
The currently approved Yandicoogina Iron Ore Mine and Railway (also known as "Yandi (HIY) Project") is located approximately 90 kilometres north west of the town of Newman. This currently approved project involves the construction and operation of: an open cut iron ore mine; facilities to crush and screen ore and convey it to the railloadout facility; and a 90 kilometre rail section which connects the mine to the Central Pilbara Railway. Compared with the approved project (... Read more...Last updated: December 2, 2011
Inquiry under s46 in regard to amendment of conditions of Ministerial Statement 808 . Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 16, 2011
Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: October 12, 2011
Channar Mining Pty Ltd has submitted a proposal to mine iron ore in the Channar Mining Area Hamersley Ranges of Western Australia. The proposal involves the establishment of primary and secondary crushers adjacent to the mine site to crush the ore. The crushed ore will then be transported by conveyor to Paraburdoo for further treatment. The initial output will be 3 million tonnes per annum (Mt/a) increasing to 10 Mt/a by the ninth year. The expected lifetime of the mine is 22 years and the... Read more...Last updated: September 28, 2011
Proposal by BGC Contracting Pty Ltd and the Dampier Port Authority to develop a quarry and industrial site and set aside land for a heritage and conservation area within the King Bay Eastern Lease Area, Burrup Peninsula. Read more...