This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 10, 2024
The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...Last updated: November 27, 2024
Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...Last updated: November 27, 2024
The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...Last updated: June 25, 2024
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: March 28, 2024
GM Giacci Family Trust propose to extract limestone from Lot 4 Binningup Road, Binningup, in the Shire of Harvey. The limestone would be extracted in seven stages and would involve crushing and screening on site. The proposal would include 26 hectares of disturbance on previously cleared farmland. Read more...Last updated: March 5, 2024
Technology Metals Australia are looking to develop the Gabanintha Vanadium Project. The Gabanintha Vanadium Project is located within WA’s Mid-West region, approximately 615 km north-east of Perth and 40 km south-east of Meekatharra, adjacent to the Meekatharra-Sandstone Road. The proposal includes development of multiple vanadium deposits (Far North, North, and Central) via open pit mining. Supporting infrastructure for the Project includes waste rock landforms (WRLs), mineralised waste... Read more...