This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 26, 2025
Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 km northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal encompasses the re-opening and enlargement of existing open cut mines, utilisation of existing infrastructure where... Read more...Last updated: June 23, 2025
Tronox Management Pty Ltd are proposing to expand the existing Cooljarloo Mineral Sands Project by mining a satellite pit named Osprey. The project is located approximately 20 kilometres northwest of Cataby. The Osprey Expansion has a disturbance footprint of 61 hectares (ha) of which 59.14 ha is native vegetation. Dredge mining will be used to avoid pit dewatering. Water for mining and concentrating will be sourced from existing licenced bores. The final mine void will be backfilled above the... Read more...Last updated: March 31, 2025
Development of Parron Wind Farm, located approximately 8 km north-west of Badgingarra, Western Australia. The Development Envelope is approximately 8,527.4 hectares with a total Disturbance Footprint of 491.54 ha. The Proposal involves the construction of up to 79 Wind Turbine Generators (WTG) capable of generating up to 489.8 MW along with associated infrastructure including access roads, electrical cabling and a substation. The wind farm will be connected to the existing 330kV transmission... Read more...Last updated: January 6, 2025
Development of a wind farm approximately 7 km east of the township of Williams and 9 km west of the township of Narrogin in Western Australia. The Proposal will involve the construction and operation of up to 25 turbines, a battery energy storage system (BESS) and ancillary infrastructure. It is located across numerous freehold properties that are primarily cleared for agricultural purposes. The proposal includes no more than 7.41 ha of remnant native vegetation clearing and 0.98 of planted... Read more...Last updated: August 22, 2022
Synergy Renewable Energy Developments Pty Ltd proposes to develop a wind farm approximately 35 kilometres north-east of Hyden townsite in the Western Australian Wheatbelt. The proposal consists of up to 30 wind turbines generating up to 150 MW, electrical substations and switchyards. The turbines will be installed on towers up to 150 m tall with blades up to 90 m long for a total height of up to 240 m. All turbines are proposed to be located at least 100 m from remnant vegetation. The proposal... Read more...Last updated: August 1, 2022
Resource Group (WA) Pty Ltd proposes to construct and operate a hard rock quarry at the location of Grass Valley, 17 kilometres east of Northam WA. The project will process blasted rock from the quarry into smaller sized proportions suitable for use in concrete, roadworks and other civil works. The operation will produce no more than 70,000 tonnes of saleable product per annum. Products will be transported from the quarry by road using truck and semi-trailers, both locally and to various sites... Read more...Last updated: July 11, 2022
Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline. The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). The proposal would include a total... Read more...Last updated: March 28, 2019
The EPA has received a third party referral for the development and operation of a Class II or III Putrescible Landfill on a property known as Allawuna, within the Shire of York. The proponent has advised the EPA that only Class II waste will be accepted. The proposal is located on Lots 9926, 26934, 4869 and 5831 Great Southern Highway, Saint Ronans. The proposal has a nominal life expectancy of 37 years and will accept between 150,000 and 250,000 tonnes of waste each year. Read more...Last updated: October 22, 2018
Kondinin Energy Pty Ltd is proposing to construct and operate up to 46 wind turbines, an accompanying 125 ha of solar farm, energy storage and associated infrastructure, approximately 5 kilometres north east of Kondinin, Western Australia. The proposal will be established encompassing parts all or part of 19 freehold rural lots comprising approximately 3,105 hectares. Read more...Last updated: April 30, 2018
Ramelius Resources Ltd propose to extend the life of the Edna May Gold Project operations by developing a new open pit immediately to the west of the existing operations. The project implementation would result in disturbance of up to 55.3 hectares of vegetation. The Edna May Gold Project is located approximately 1 km north-west of the township of Westonia and 312 km east of Perth. Read more...Last updated: December 7, 2016
The Shire of Gingin has referred an application to make alterations and additions to an existing Poultry farm. The application, from Allerding and Associates on behalf of Snowdale Holdings Pty Ltd, is to add four additional free range chicken sheds and associated paddocks, a manure storage shed, workers accommodation for staff, and to relocate the proposed caretakers dwelling. The purpose of the alterations and additions is to increase the farm capacity from 120,000 to 240,000 chickens. Read more...Last updated: December 7, 2016
The Shire of Gingin has referred an application for planning approval to the EPA for a decision on whether or not to assess the proposal and, if so, the level of assessment. The application, from Saratoga Holdings Pty Ltd, is for turf production on Lot 5, 55 Clark Road, Neergabby in Gingin (Shire of Gingin). Read more...Last updated: April 26, 2016
Brikmakers Pty Ltd proposes to extract clay from Lot 7 Toy Rd Bindoon, within the Shire of Chittering. Approximately 15 hectares (ha) of predominately pasture land will be disturbed for the construction of two clay excavation pits, a stockpile area, two dams, and bunds. Upgrading of a causeway across the Brockman River, which traverses west to east along the southern portion of the property, together with a new crossover to Toy Road is also proposed. Read more...Last updated: October 7, 2013
Opal Vale Pty Ltd propose to develop a Class II Landfill site within an existing clay pit at Lot 11 Chitty Road, Toodyay. The site is the Williamson's Clay Pit which is situated on the south eastern portion of Lot 11, approximately 1.25 km to the east of Chitty Road. Read more...Last updated: August 5, 2013
AAA Egg Company Pty Ltd proposes to develop a Poultry Farm in the Shire of Gingin on Lot 7974 Cowalla Road, Wanerie. Lot 7974 is approximately 191.15 hectares (ha) in size and is located approximately 27 km northeast of the Gingin townsite. The proposal is for a three staged free range egg production development. The development is to include three blocks of four Free-Range Sheds and associated infrastructure for a total of 360,000 birds. Stage 1 of the development is for one block of four Free... Read more...Last updated: December 17, 2012
Empire is proposing to conduct a 3D seismic survey over the Gingin Gas Fields including parts of the Boonanarring and Bartlett's Well nature reserves, utilising a helicopter assisted or 'heliportable' technique, transporting drilling and seismic receiver equipment by a long-line, suspended beneath a helicopter. The equipment is lowered into position and released at pre-programmed points. Charges are detonated one at a time and seismic data is recorded. Site remediation and site... Read more...Last updated: December 3, 2012
The advice applies to a proposal referred to the Environmental Protection Authority (EPA) by Capital Recycling on 6 November 2012. The proposal is to extract gravel from Lot M1822 on Diagram 8755 Horton Road, Woottating in the Shire of Northam. The proposal is a small scale gravel quarry which is not operating on a continual basis. The potential impacts of dust, noise and groundwater exposure from this proposal are not considered to be such a significant matter that assessment by the Office of... Read more...