This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 2, 2011
Inquiry under s46 in regard to amendment of conditions of Ministerial Statement 808 . Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: September 13, 2011
Koolyanobbing Iron Ore Expansion - proposal under s46 to remove condition 7 of Ministerial Statement 627. Read more...Last updated: August 8, 2011
The proposal is for the development and operation of a quarry incorporating excavation of approximately 60 million tonnes of hard rock, approximately 2 million tonnes of gravel and approximately 12 million tonnes of clay from the quarry footprint. Inquiry under s46 in regard to proposed changes to the environmental conditions of Ministerial Statement 706 . Read more...Last updated: January 10, 2011
The proposal is to conduct a 3D seismic survey within an area consisting of private land, the proposed Big Soak Plain Conservation Park and the Watheroo National Park approximately 60 kilometres east of Jurien Bay. The survey would involve the rolling of vegetation for vehicle access to the seismic lines. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: June 11, 2009
To construct and operate a landfill accepting Class II-type waste. Six cells will be constructed with a total operational lifetime of not more than 30 years. A landfill gas collection system and utilisation plant facility will also be constructed. Read more...Last updated: March 16, 2009
The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities. Read more...Last updated: February 7, 2008
Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...Last updated: August 6, 2003
The proposal is for a poultry litter fired power station at a site approximately 70 kilometres north of Perth on the Brand Highway near Muchea. The power station would receive poultry litter from farms across the broad Perth region. Delivery would be by covered trucks, which would enter the enclosed litter reception shed and tip onto a concrete floor. A front-end loader would be used to place the litter on to a conveyor which would place it on the stockpile. The trucks would be washed down... Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: March 1, 2002
The Western Australian government has committed to remediating three contaminated sites on the west side of Morangup Road, approximately 25km south-west of Toodyay. A small amount of contamination from Site C has entered Lot 12. This contamination will be removed as part of Site C’s remediation. Read more...Last updated: November 14, 2001
The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and... Read more...Last updated: October 31, 2001
Extension of mine area to include an area containing Declared Rare Flora (DRF) and a Threatened Ecological Community (TEC). The proponent has proposed a Resource Access and Conservation Package to enable mining of this area whilst providing biodiversity conservation benefits for the community and the State. Inquiry under s46 into amending the conditions of Ministerial Statement 27 and Ministerial Statement 279 . Read more...Last updated: November 10, 2000
The proposal is to mine titanium minerals from Orebodies 27, 200 and 28000, adjacent to the southern mining operations of the existing Cooljarloo Mineral Sands mine, located 10 kilometres north-west of Cataby, Shire of Dandaragan. Read more...Last updated: April 19, 2000
Inquiry under section 46 of the Environmental Protection Act 1986 to extend the time limit of the environmental approval for the Great Eastern Highway Northam bypass. Read more...Last updated: March 10, 1999
To clear approximately 183 hectares of native vegetation on Victoria Location 10323, Shire of Dandaragan. Read more...Last updated: February 15, 1999
The Minister for Environment directed the EPA to reassess this proposal, previously Assessment no. 880 , pursuant to s43 of the EP Act. The proposal is to clear 870 hectares of native vegetation on Victoria Location 10598 Cockleshell Gully Road, Shire of Dandaragan to plant tagasaste. Victoria location 10598 comprises 1,705 hectares of which 500 hectares (30%) is currently cleared. It is proposed to retain 350 hectares (21%) of the property as native vegetation in accordance with the farm plan... Read more...Last updated: March 27, 1998
The proposal is for a 33 kilometre coastal road linking the town-sites of Cervantes and Jurien. Read more...