Geraldton Southern Transport Corridor

Project
Proposal description

The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and the use of local roads by heavy transport traffic.

The key components of the proposal are:

  • a new single rail alignment from the Narngulu Industrial Area to the Geraldton Port;
  • a new east-west road link from the Geraldton Airport to the Geraldton Port; and
  • associated interchanges and connections to the local road system.
Assessment Number
1375
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
4. EPA Report on assessment
EPA Report Number
1013
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email