This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: March 13, 2009
The proposal involves the construction and operation of a 40 Megawatt power plant fuelled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Read more...Last updated: August 6, 2003
The proposal is for a poultry litter fired power station at a site approximately 70 kilometres north of Perth on the Brand Highway near Muchea. The power station would receive poultry litter from farms across the broad Perth region. Delivery would be by covered trucks, which would enter the enclosed litter reception shed and tip onto a concrete floor. A front-end loader would be used to place the litter on to a conveyor which would place it on the stockpile. The trucks would be washed down... Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...Last updated: March 18, 2003
The proposal is for construction of a natural gas fired cogeneration facility on a 2.5ha site located within Alcoa’s Pinjarra Alumina Refinery. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will own the facility and will supply steam to Alcoa for refinery purposes. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will sell the power generated to customers within the South-West Interconnected System (SWIS). Alcoa will operate the facility within the framework of the Pinjarra refinery operations. The... Read more...Last updated: January 6, 1994
The proposal is to establish an energy infrastructure in the Pilbara region of Western Australia. This proposal will provide natural gas and electric power for future industrial developments and includes: a 215 kilometre buried gas pipeline from Karratha to Port Hedland; a gas turbine power station at Port Hedland; approximately 400 kilometres of high-voltage power transmission line from Port Hedland to Newman; a back-up generating plant at Newman; and closure of the existing diesel powered... Read more...Last updated: October 27, 1992
The proposal is to establish a 2,500 kilowatt wind farm and associated 33kV powerline near Esperance. The wind farm is to be built within 'C' class Flora Reserve Number 24486, near Nine Mile Beach approximately 8km west of Esperance. Read more...