Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (4) Apply Land use filter
  • Industrial (3) Apply Industrial filter
  • Power generation (3) Apply Power generation filter
  • Bauxite (2) Apply Bauxite filter
  • Clearing (1) Apply Clearing filter
  • Infrastructure (1) Apply Infrastructure filter
  • Iron Ore (1) Apply Iron Ore filter
  • Mineral sands (1) Apply Mineral sands filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (11) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by preliminary environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • 37 (8) Apply 37 filter
  • Flora and Vegetation (6) Apply Flora and Vegetation filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Inland Waters (4) Apply Inland Waters filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Alcoa World Alumina Australia (1) Apply Alcoa World Alumina Australia filter
  • Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd (1) Apply Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd filter
  • Alinta Cogeneration (Wagerup) Pty Ltd (1) Apply Alinta Cogeneration (Wagerup) Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • City of Mandurah (1) Apply City of Mandurah filter
  • Homeswest (1) Apply Homeswest filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • Royal Aero Club of WA & Hawkview Holdings Pty Ltd (1) Apply Royal Aero Club of WA & Hawkview Holdings Pty Ltd filter
  • Royal Aero Club of WA & Hawkview Holdings Pty Ltd. (1) Apply Royal Aero Club of WA & Hawkview Holdings Pty Ltd. filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • Transfield Services Kemerton Pty Limited (as trustee for Transfield Services Kemerton Trust) (1) Apply Transfield Services Kemerton Pty Limited (as trustee for Transfield Services Kemerton Trust) filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter

Filter by region:

  • (-) Remove Peel filter Peel
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (3) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (1) Apply 2013 filter
  • 2006 (1) Apply 2006 filter
  • 2003 (1) Apply 2003 filter
  • 1998 (1) Apply 1998 filter
  • 1993 (1) Apply 1993 filter
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. Peel

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pinjarra Alumina Refinery Revised Proposal

Last updated: May 29, 2025

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Samson Brook Redevelopment Scheme

Last updated: May 20, 2025

The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...

Worsley Mine Expansion – Revised Proposal

Last updated: December 20, 2024

South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...

Clearing Permit Application at Myara North

Last updated: November 4, 2024

Alcoa of Australia Limited’s (Alcoa) clearing permit application (CPS 10626/1) to the Department of Energy, Mines, Industry Regulation and Safety is for the clearing of native vegetation for geotechnical investigations. Under the original CPS application, referred to the EPA, Alcoa sought to clear 20 hectares of native vegetation (ha). However, Alcoa has since amended the application to reduce the area to 11ha. The geotechnical investigations are located at Myara North which is a future mine... Read more...

Wagerup Cogeneration Project

Last updated: June 27, 2024

Read more...

Kemerton Power Station

Last updated: August 11, 2023

The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...

Lots 2 and 10 Rowley Road, Mandogalup

Last updated: September 6, 2022

Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...

Sediment removal in the Lower Vasse River

Last updated: November 1, 2021

The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...

Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (728 and 1069) (S46) [2179]

Last updated: January 7, 2021

Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...

Tim's Thicket Liquid Waste Facility Upgrade

Last updated: September 10, 2020

The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...

Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining (s. 46)

Last updated: September 27, 2016

The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...

Pinjarra Refinery Efficiency Upgrade

Last updated: September 21, 2015

The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...

Murrayfield airpark and resort complex [807]

Last updated: March 28, 2013

The revised proposal includes: a resort complex to accommodate approximately 370 tourists; expanded airstrip facilities, involving two sealed runways (05/23 and 09/27) and one grassed runway for use by single and twin engine propeller driven aircraft. lt is expected that both experienced and trainee pilots will utilise the site; and a nine hole golf course . The location of the primary runway (05/23) has been relocated 30 metres to the east of the previously identified location to increase the... Read more...

Waroona Mineral Sands Project

Last updated: June 30, 2006

The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...

Pinjarra Cogeneration Project

Last updated: March 18, 2003

The proposal is for construction of a natural gas fired cogeneration facility on a 2.5ha site located within Alcoa’s Pinjarra Alumina Refinery. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will own the facility and will supply steam to Alcoa for refinery purposes. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will sell the power generated to customers within the South-West Interconnected System (SWIS). Alcoa will operate the facility within the framework of the Pinjarra refinery operations. The... Read more...

Residential development and drainage, Amarillo Farm, Karnup

Last updated: April 15, 1998

The proposal is to undertake residential development and drainage works at Amarillo Farm, Karnup, to make suitable for residential development a large land holding of 3 980 ha, most of which is currently seasonally waterlogged and requires a combination of drainage into the Serpentine River/Peel-Harvey Estuary and filling. Read more...

Murrayfield airpark and resort complex [231]

Last updated: January 14, 1993

The Murrayfield Airpark development proposal is sited 10km north-east of Mandurah on lots 11 and 12 Nambeelup Road, Nambeelup. The total area of these holdings is approximately 190 ha. The proposal is to amend the Shire of Murray Town Planning Scheme to permit the construction of an airpark, comprising a resort complex, expanded airstrip utilities and a golfcourse. The existing provision restricts development to rural land uses only, a zoning which permits the operation of a rural airstrip. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.