This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 18, 2021
Covalent Lithium Pty Ltd proposes to develop a pegmatite-hosted lithium deposit at the abandoned Mt Holland Mine Site. The proposal area is located approximately 105 kilometres south-southeast of Southern Cross, in the Shire of Yilgarn. The proposal is for conventional open-cut mining of the existing Earl Grey pit, and development of associated mine infrastructure. The new mining proposal would utilise some existing infrastructure and disturbed areas. The mining proposal involves disturbance of... Read more...Last updated: May 14, 2021
The Minister has requested the EPA inquire into the question of whether the implementation conditions relating to Offsets in MS 1118 should be changed. The proponent has specifically requested: Amendment of wording of Condition 8-1 (3) to only refer to direct impacts to Ironcaps Banksia individuals. Removal of Condition 8-8 (4) and 8-8 (5), as these conditions refer to protection mechanisms and conservation reserves. Amend Conditions 8-7 to 8-12 to allow a rehabilitation based offset strategy,... Read more...Last updated: May 10, 2021
Norton Gold Fields Pty Ltd propose to develop the Binduli North Project located approximately ten kilometres west of the city of Kalgoorlie-Boulder. The proposal includes the expansion of three existing open pits, the development of a new open pit, waste rock dumps, run of mine pads, a heap leach processing facility, processing plant infrastructure and supporting mine infrastructure. The proposal has a disturbance footprint of 924.2 ha which includes 270.1 ha of previously disturbed land and a... Read more...Last updated: May 10, 2021
The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...Last updated: April 6, 2021
Focus Minerals Ltd propose a small scale operation limited in duration for crushing and screening waste rock material from an existing waste rock dump at the Lancefield Gold Mine area. The proposal is located approximately 250 kilometres north east of Kalgoorlie. There will be approximately 1.5 hectares of clearing for a water pipeline and widening access tracks to support the mobile crushing and screening machinery. Read more...Last updated: February 1, 2021
Change relates to requirements of condition 7 -1(1) and 7-1(3), and includes an update of Figure 4 and change to Schedule 2 to amend the spatial dataset to reflect the removal of Malleefowl Mound Exclusion Zone for MM23 referred to in condition 7-1(1) Amend conditions 8-1(4) and 8-8(2) to replace the reference to 6,957 individuals of Microcorys sp. Mt Holland (D.Angus DA2397) to 15.93 per cent of the regional population. This proposal was assessed in conjunction with assessment 2279. EPA Report... Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: September 24, 2020
Change to implementation conditions relating to financial assurance requirements. Read more...Last updated: September 16, 2020
Ashton Rare Earths Pty Ltd wishes to extend the time limit of environmental approval for the proposed Rare Earths Mining and Beneficiation at Mt Weld and Secondary Processing at Meenaar project for a further three years. Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: June 24, 2019
The Shire of Esperance propose to demolish the heritage listed Esperance Tanker Jetty as it has fallen into disrepair and no longer deemed economically viable for the Shire to maintain. The Shire proposes to build a replacement jetty in close alignment with the old structure and extending 400m of its original 512m length. The old piles of the Tanker Jetty will be retained in-situ at mean sea level for the length of the old structure and three meters below the lowest astronomical tide past the... Read more...Last updated: May 23, 2019
Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...Last updated: April 15, 2019
The Department of Agriculture and Food, Western Australia (DAFWA) proposes to erect a 660 kilometre long, 1.35 metre high extension to the existing State Barrier Fence from its current termination point near the town of Ravensthorpe to the east of Esperance near Cape Arid National Park. The purpose of the Esperance extension is to protect the south-eastern agricultural enterprises from predation and grazing from wild populations. This proposal was originally referred by the Conservation Council... Read more...Last updated: April 1, 2019
Changes to condition 7 (Restricted areas and management of Tetratheco paynteroe ssp. paynterae at the Windarling Range) to allow future ground disturbing access to the restricted 'Area B', and condition 10 (Residual impacts and risk management measures) in terms of revised research and management offset measures for threatened flora species. Read more...Last updated: February 5, 2019
The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...Last updated: September 17, 2018
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: January 25, 2017
The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...Last updated: January 9, 2017
Lost Sands Pty Ltd (Lost Sands) proposes to develop and operate the Cyclone Mineral Sands Project, located on the northern margin of the Eucla Basin, approximately 317 kilometres (km) north of Eucla and 220 km north of the Trans-Australia Railway. The proposal is for a mining operation to produce zircon and two high titanium mineral products. The conceptual layout of the mine includes open cut pits, mining and processing infrastructure, airstrip, camp and bore fields. The proposal is located in... Read more...