This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 22, 2004
Roc Oil (WA) Limited proposes to develop the Cliff Head Oil Field located approximately 20 kilometres (km) south of Dongara. Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: September 29, 2004
The proposal involves the construction, deepening and extension of shipping channels, a swing basin and berth pockets for the passage and docking of ships by dredging of approximately 3.1 million cubic metres of earth and rock material from the sea bottom. The dredge materials will be disposed of to designated sites on land and on the ocean floor. Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: December 16, 1999
Proposal by LandCorp to dredge, reclaim land and create up to three level lots at Lots 165-168, Henderson Road Cockburn for use by shipbuilding industry within the Northern Harbour of Jervoice Bay, which may include a ship-lift facility. Read more...Last updated: June 17, 1999
Proposal to construct additional crystallizer ponds at the existing salt works in Useless Loop, Shark Bay. Read more...Last updated: June 14, 1999
The proposal is to construct a new series (F series) of crystallizer ponds at the northern edge of the existing Shark Bay Salt crystallizers in Useless Loop, Shark Bay. Construction of the new series of ponds will enclose approximately 125 hectares of shallow marine environment up to the boundary of Mining Lease 260 SA, of which some 60 hectares is seagrass. Read more...Last updated: February 10, 1999
Dredging of approximately 9.1 million tonnes of shellsand from two zones on Success Bank, Owen Anchorage over the period 1997 to approximately the end of 2002. Shellsand of high quality, about 92% calcium carbonate is used by Cockburn Cement Ltd (the proponent) for the manufacture of quicklime and cement products. Read more...Last updated: December 11, 1998
The proposal is to drill a land based exploration well on Commonwealth (Navy) land at Point Murat, Cape Range Peninsula. The well will be drilled directly to intersect a target at a depth of about two kilometres below Ningaloo Marine Park. Read more...Last updated: July 14, 1998
The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...Last updated: January 19, 1998
The proposal is to construct and operate a barge loading facility south of Mowbowra Creek in the Shire of Exmouth for the export of limestone proposed to be mined from the nearby Whitecrest Limestone Mine. The proponent has indicated that a future proposal to develop a larger shipping facility, including a dredged shipping approach, is envisaged. Such a proposal is not considered as part of this assessment, and will require further environmental impact assessment at a later stage should the... Read more...Last updated: August 28, 1997
The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...Last updated: July 14, 1997
The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...Last updated: June 19, 1997
The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...Last updated: November 11, 1996
The proposal is to construct a new berth at the eastern end of the Port of Albany, reclaim 5.5ha of Princess Royal Harbour to provide land backing to the new berth, and dredge a basin 6.0ha in extent between the berths and the existing entrance channel to provide sufficient depth of water for ship handling purposes. Read more...