This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: July 17, 2006
Proposal by Mr D J & Mrs R Winter to subdivide Lot 1613 Barrett Street, Southern River. Read more...Last updated: June 30, 2006
The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: May 17, 2006
The proposal is for the development of a titanium minerals mine at Tutunup, approximately 20 km east of Busselton. The proposal has the following main components: disturbance of 120 hectares of mainly cleared agricultural land; construction of water and fines dams, and topsoil, tails and overburden stockpiles; dewatering and mining, using dry mining techniques at up to two million tonnes per annum; abstraction of groundwater from the Yarragadee aquifer for process use; haulage of the Heavy... Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...Last updated: March 8, 2006
Striker Resources NL proposes to establish a dry door barge site, laydown area, and access road in a coastal inlet 36 kilometres (km) southeast of Cape Londonderry. The site, known locally as Gumboot Bay, is on Unallocated Crown Land that has been identified for inclusion in the Proposed Cape Londonderry National Park (PNP/215). The proposal also includes 3.6 km of unsealed road to be constructed through the PNP/215. This report provides the Environmental Protection Authority's (EPA's... Read more...Last updated: February 13, 2006
Readymix Holdings Pty Limited proposes to extend its Nickol Bay quarry, located at the southern end of the Burrup Peninsula near Dampier, by an area of approximately 5.2 hectares. Read more...Last updated: January 25, 2006
Main Roads Western Australia (MRWA), propose to construct an On-ramp from Abernethy Road to Tonkin Highway, Kewdale. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations as required by Section 44 of the, Environmental Protection Act 1986, to the Minister for the Environment, on the environmental factors relevant to the proposal. Read more...Last updated: January 24, 2006
Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...