This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...Last updated: April 17, 1997
The proposal is to develop a titanium minerals mine on Mining Leases 70/49, 70/937 and 70/938 and to mine an ore body located on Reserve 31900 and private property within the Shire of Harvey. The ore body consists of two occurrences of heavy mineral concentrate separated by the Waterous Formation Creek, and adjacent to Black Rock Road. Read more...Last updated: March 14, 1997
Main Roads Western Australia proposes to reconstruct the existing two lanes into a four lane carriageway at the Bedfordale Hill section of Albany Highway between the end of the existing dual carriageway and the road train assembly area in the City of Armadale. The earthworks for the proposed carriageway encroach onto Bungendore Park which is part of System 6 Recommendation MSO - Darling Scarp. The proposal also involves the deviation of Neerigen Brook in two locations. Read more...Last updated: February 17, 1997
The proposal is to extend the pit of the Nickol Bay Quarry along the Pistol Range within an area covered by Mining Leases M47/306, M47/331, M47/309, and M47/353. The proposal does not alter the nature of quarry operations carried out at the Nickol Bay Quarry. Read more...Last updated: February 6, 1997
The Gnangara Mound Groundwater Resources proposal (Pinjar ground water extraction Stage 1) was proposed by the Water Authority of WA (WAWA) in 1986, assessed by the EPA as an Environmental Review and Management Programme (ERMP) and approved by the Minister for the Environment in 1988 subject to the Minister's Environmental Conditions. The ERMP addressed a range of issues concerning the overall management of ground water resources on the Gnangara Mound, taking into account the requirements... Read more...Last updated: January 17, 1997
Mr P G Patterson proposes to mine gypsum sand from the dunes along the southern edge of Lake Chinocup, within the Chinocup A Class Nature Reserve. Lake Chinocup is 25km east of Nyabing, the local government centre for the Shire of Kent, and 10km west of Pingrup. Read more...Last updated: December 7, 1996
The main components of the proposal are: a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site; approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel; two areas of communal (group) housing development (R 40) covering 2. 7ha and providing... Read more...Last updated: December 2, 1996
The original proposal was to subdivide Lot 6 Old Coast Road into eleven lots ranging in size from 2 hectares (ha) to 6 ha each. During the public review period for the draft criteria, the proponent modified the proposal and now proposes to subdivide Lot 6 into 9 lots averaging approximately 4 ha. The proposal is located within the Lake Clifton catchment area. Lake Clifton is one of the most significant wetlands in Western Australia due to its international importance as a waterbird habitat and... Read more...Last updated: December 2, 1996
The proposal is for the the Rural subdivision of Lots 102-106 and Lot 152, Armstrong Hills Drive, Shire of Waroona, within the catchment of Lake Clifton, Western Australia. The proposed subdivision lies in two sections to the east and west of an existing special rural subdivision. Lot 152 comprises the eastern portion and it is proposed to subdivide it into 11 lots of approximately 2 ha each. Lot 152 is in the Peel-Harvcy catchment. Environmental conditions in relation to its development are... Read more...Last updated: November 14, 1996
The proposal is to develop and implement a programme to improve management of dust and reduce the dust impacts from BHP Iron Ore's operations at Finucane Island and Nelson Point in Port Hedland. The proponent has acknowledged that iron ore dust from its operations is an issue of concern to the Port Hedland community and has implemented some dust control measures. In addition, during the assessment of the Hot Briquetted Iron (HBI) project in Port Hedland (EPA, 1995), the EPA recognised that... Read more...Last updated: November 11, 1996
The proposal is to construct a new berth at the eastern end of the Port of Albany, reclaim 5.5ha of Princess Royal Harbour to provide land backing to the new berth, and dredge a basin 6.0ha in extent between the berths and the existing entrance channel to provide sufficient depth of water for ship handling purposes. Read more...Last updated: November 6, 1996
The proposal is to dredge two channels to connect the Swan River with an internal artificial water body. Construction of the channel will involve: dredging of one 15m wide, 1 m deep channel through the System 6 area and near shore sandbars at the northern end of the wetland; the excavation of a 55m wide channel to -2.5m AHD, through the southern end of the tip site; plus the dredging of a 320m long, 55m wide navigation channel to -2.5m AHD through river shallows to connect with the main deep... Read more...Last updated: October 22, 1996
The proposal is to develop a nickel/cobalt ore mining and processing operation 50km north-west of Kalgoorlie and 9km east of Ora Banda. Read more...Last updated: October 22, 1996
Inquiry under s46 regarding a request to alter the existing environmental conditions of Ministerial Statement 117 to accommodate the following three changes: Extension of the eastern waste rock dump into a section (Six Mile Well block) of the Wanjarri Nature Reserve under an arrangement with the State which involves the permanent addition of a similar area of land to the nature reserve and eventual return of the Six Mile Well Block to the Wanjarri Nature Reserve. Establishment of a downstream... Read more...Last updated: October 22, 1996
The proposal is to develop the Bulong Nickel Cobalt Laterite Project. The proposed nickel/cobalt ore mining and processing operation is located approximately 30km east of Kalgoorlie, in Western Australia. The project involves the establishment of open cut mine pits, a processing plant and associated infrastructure. The project will produce refined products of nickel and cobalt. Read more...Last updated: September 20, 1996
The proposal is to develop for special residential purposes Lyndon locations 222 and 223, approximately 10 kilometres south of Exmouth. The subject land is on the eastern shoreline of the Cape Range peninsula immediately inland of the coastal dunes and approximately 10 kilometres south of Exmouth. It is proposed to subdivide the land into 177 special residential lots, ranging in area from approximately 0.4 to 3.4 hectares. The EPA's report was released. The WAPC refused the planning... Read more...Last updated: September 5, 1996
The proposal is to build and operate a rare earth plant on a site 4 km south of Alcoa Alumina Refinery and adjacent to the existing Rhone-Poulenc Gallium Plant at Pinjarra, approximately 100km south of Perth and 30 km south-east of Mandurah. The plant will produce 15,000 tonnes per annum (tpa) of solid rare earth nitrate concentrate. Read more...Last updated: July 29, 1996
Proposed modification of Environmental Condition 7 of AP and M Boucaut's statement and Environmental Condition 3 of the Shire of Murray's statement of approval for the rezoning of Lot 6 nad Part lot 64 Lloyd Avenue, Ravenswood from "Residential Development" to "Residential R-10" and "Caravan and Chalet Park" Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: June 28, 1996
The proposal is to improve Albany Port's facility for the mooring of existing port service vessels and for a new large tug. The proposal involves: dredging of approximately 25,000 cubic metres (m 3 ) (1.6 hectares) of material to provide a maximum water depth of -6m CD (Chart Datum); reclamation of 0.4 hectares of PRH using dredge spoil; establishment of a coarse sand beach fronting the reclamation area; construction of a rubble mound breakwater, approximately 250 metres long, using... Read more...