ProjectProponent: Esplanade (Mandurah) Pty ltdProposal description: The main components of the proposal are: a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site; approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel; two areas of communal (group) housing development (R 40) covering 2. 7ha and providing 110 residences; a heritage precinct of 1.4ha comprising the Old Sutton farm buildings and associated helitage features; 5.2ha of Public Open Space, to include a historical graveyard and two sites of Aboriginal cultural heritage; and new bridges where the main canal system passes under Mary Road and Old Coast Road, along with other smaller bridges within the canal development. The project would be developed in four phases over a period of five to eight years. Assessment Number: 731Region: PeelReferred under EP Act: s38Industry sector: Land useLast updated: December 7, 1996Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Assess - Public Environmental ReviewPreliminary Environmental Factors: Marine Environmental QualityHydrological ProcessesInland Waters Environmental QualityDate published: Saturday, 30 May, 1992 3. AssessmentScopingApproved: Friday, 28 August, 1992 Environmental ReviewPublic submissions: Monday, 10 April, 1995 to Friday, 2 June, 1995Environmental Review documentation: PER document (PDF, 12.26 MB) Appendices to the PER document (PDF, 10.06 MB) 4. EPA Report on assessmentEPA Report Number: 790EPA Report: Port Mandurah Canal Estate Stage 2 (PDF, 2.89 MB)Date published: Friday, 22 September, 1995 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Saturday, 7 December, 1996Ministerial Statement: Ministerial Statement 402 (PDF, 221.04 KB)