This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 30, 2023
The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: November 6, 2023
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: October 19, 2023
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...Last updated: October 16, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: September 29, 2023
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: July 5, 2023
Change to condition 3 to extend the time limit for proposal implementation Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: June 26, 2023
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 16, 2023
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: June 7, 2023
Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion. The extent of proposed ground disturbance is approximately: 11,322 hectares for the mine expansion within a development... Read more...