This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: April 4, 2023
Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...Last updated: May 31, 2022
Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road. The development envelope is approximately 3.8 km 2 in size and includes a single access jetty, onshore strategic port land, renewables precinct, desalination infrastructure and fuel storage. Read more...Last updated: November 30, 2021
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...