This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: November 29, 2005
The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...Last updated: August 25, 2005
The proposed Simpson Development proposal will make use of three existing wells and one that is the subject of a separate referral. The development will consist of: the Simpson Alpha offshore mini-platform located at the Tanami-4 and Tanami-5 wells surface location; the Simpson Bravo offshore mini-platform located at the Simpson-1 and Simpson-3H well locations; and a sub-sea pipeline bundle linking the two mini-platforms to each other and to existing facilities on Varanus Island. The pipeline... Read more...Last updated: December 22, 2004
Roc Oil (WA) Limited proposes to develop the Cliff Head Oil Field located approximately 20 kilometres (km) south of Dongara. Read more...Last updated: October 28, 2004
The proposed Denison 3D Seismic survey, which is proposed to commence in the fourth quarter of 2004, will take place within a survey area with an estimated gross area of approximately 394 square kilometres (39400 hectares). Approximately 782 hectares (2% of the gross area) will be directly accessed by survey activities. Approximately 11,455 hectares (29% of the gross survey area) occurs in nature reserves and a further 9,900 hectares (25% of the gross survey area) supports native vegetation. Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: January 18, 1999
Apache Northwest Pty Ltd proposes to drill two exploration wells, Chelonia-1 and -2 in Permit Area EP 342 which is located at the head of Exmouth Gulf. Both wells will have the same surface location, situated outside the Ningaloo Marine Park, approximately 100 m from the boundary and 4 km to the SSW of South Muiron Island. Read more...Last updated: December 11, 1998
The proposal is to drill a land based exploration well on Commonwealth (Navy) land at Point Murat, Cape Range Peninsula. The well will be drilled directly to intersect a target at a depth of about two kilometres below Ningaloo Marine Park. Read more...Last updated: July 14, 1998
The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...Last updated: November 25, 1997
The proposal is to drill and evaluate a land-based exploration well, Melanie-1, on Cape Range Peninsula for a gas and oil target. The proposal does not include any future plans to develop a gas or oil field. The proposed Melanie-1 exploration well is located near the north western tip of Cape Range Peninsula, inland of the Yardie Creek Road and behind the line of hills which form the continuation of Cape Range. The project site, which covers an area of approximately 0.8 hectares, is... Read more...Last updated: September 25, 1997
The proposal is to develop the Wonnich gas field situated some 8 km south-west of the Montebello Islands. Read more...Last updated: June 19, 1997
The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...Last updated: September 8, 1995
The proposal is to develop the East Spar offshore gas field, located in Commonwealth waters approximately 50 kilometres west of Barrow Island. Processing facilities would be constructed and operated on Varanus Island immediately adjacent to the existing Harriet Joint Venture facilities on the island. A new submarine pipeline would bring gas/condensate from the gas field to the processing facilities. The existing Harriet Joint Venture export pipeline would carry gas to the trunkline on the... Read more...Last updated: June 9, 1995
Ampolex Ltd proposes to drill an exploration well at a site approximately 8 km south-west of Hermite Island in the Montebello Islands and approximately 3 km west of the Montebello Islands barrier reef Read more...Last updated: November 25, 1994
The Goldfields Gas Pipeline Joint Venture participants propose to construct a buried pipeline from near Onslow to Kalgoorlie, via Newman in the eastern Pilbara. The pipeline would transmit gas from the existing Dampier to Perth gas pipeline to the Pilbara and Goldfields regions, initially for power generation at mine sites owned by the participants. Six lateral buried pipelines would be constructed from the main pipeline to deliver gas to the proposed gas-fired power stations at the mine sites... Read more...Last updated: March 17, 1994
West Australian Petroleum Pty Ltd (WAPET) has sought approval for changes to refuelling practices and oil spill response plans in its offshore permit area, TP/3 Part 1, located west of Onslow. The changes would be effective whilst oil production in Roller Oilfield and drilling elsewhere in Exploration Permit TP/3 Part 1 are under way. Read more...Last updated: January 11, 1994
The intended location for disposal of dredge spoil is proposed to be changed from land disposal in No Name Creek (as approved in Ministerial Statement 320 ) to marine disposal in a previously used offshore disposal ground. Woodside believes that offshore disposal will provide more assurance than onshore disposal in preventing any significant environmental impact to the near shore environment. This is the inquiry under s46 regarding the proposed change. To comply with other statutory... Read more...Last updated: August 24, 1993
The proposal is to establish additional facilities for liquefied petroleum gas (LPG) extraction and export within the existing onshore treatment plant at the Burrup Peninsula. The existing Gas Treatment Plant occupies 231ha on a lease at Withnell Bay, near Dampier on the Burrup Peninsula about 1,300km north of Perth. The area within the lease has undergone major development, with the portions of Plant constructed to date consisting of a domestic gas plant, a liquefied natural gas (LNG) plant,... Read more...Last updated: December 2, 1992
The proposal is for an offshore exploration drilling programme for petroleum within permit areas EP 341 and EP 364 which lie offshore and to the north east of the town of Onslow. This proposal seeks environmental approval for the drilling of an unspecified number of exploration wells within the permit areas. At this time two wells to test two targets have been outlined; near Lightfoot Reef, north of Large Island, and north of Passage Island. The permits lie within a Special Protection Locality... Read more...Last updated: April 6, 1992
Proposal by Minora Resources NL for drilling within petroleum exploration permit area EP 325, situated in the Exmouth Gulf Area. Read more...