Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: January 24, 2018
The Shire of Denmark proposes to extend the existing quarry and crush limesand within an A Class Parkland and Recreation Reserve vested in the Shire of Denmark. Read more...Last updated: July 17, 2017
The proposal is to subdivide Lot 21 Webster Road, Forrestfield into seven (7) industrial lots as documented in Schedule 1 of Ministerial Statement 841 . The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Industrial Subdivision of Lot 21 Webster Road Forrestfield proposal in order to extend the “Commencement and Time Limit of Approval” for substantial... Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: January 23, 2017
This proposal is to amend conditions of Ministerial Statement 433 relating to dust where these emissions are appropriately regulated through part V of the EP Act. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: December 15, 2016
The proposal is to operate a regional airport at the Four Mile Hill site. During the assessment of an expansion to the Busselton Regional Aerodrome , the proposal was changed under s.43A of the, Environmental Protection Act 1986, to remove the runway extension, widening and strengthening component. The details of the existing runway are defined in Schedule 1 of Ministerial Statement 901 for this proposal and, as such, a section 45C change to Ministerial Statement 901 has been approved for the... Read more...Last updated: November 23, 2016
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions of Ministerial Statement 741 and Ministerial Statement 840 relating to dust and noise regulation for Cape Lambert Port A and B development proposals under s46 of the EP Act. Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: September 27, 2016
The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...Last updated: September 27, 2016
The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for “University purposes - future use and development”, as it is affected by odour from the Subiaco Wastewater Treatment... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: September 21, 2015
The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...