Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 6, 2016
The proposal is to construct a single residence on Lot 1613 Barrett Street, Southern River. The proposal includes a residence, garage, swimming pool, stables, paddocks, access way and landscaping with an ornamental lake. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...Last updated: September 10, 2012
The most significant impact of the proposed resource extraction involves the clearing of 219 hectares of native vegetation. A beneficial outcome of the proposal is the retention of 218ha of remnant native vegetation for conservation purposes, which includes: • Bush Forever sites 293 and 384 (119ha); and • Threatened Ecological Community (FCT 26a) and Priority Ecological Community (FCT24) (99ha). Read more...Last updated: May 9, 2011
The proposal is to extend the transport depot at Lot 14 Great Northern Highway, Upper Swan. The extension involves the construction and use of a hardstand area for the parking of cars, trucks, trailers, and heavy machinery and the construction and use of a caretaker’s residence. Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...Last updated: October 11, 2009
The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha). Approximately 53.9 ha of this area will... Read more...Last updated: June 6, 2007
The remediation of approximately 17 hectares of land, known as the Helena East Precinct and the Southern Embankment located centrally in the former Railway Workshops area, which includes relocation of contaminated soil to an area immediately east of the Police Operations Support Facility known as the Meat Industry Association Containment Cell. Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: December 3, 2003
Proposal by the Midland Redevelopment Authority (MRA) to remediate 15.5 hectare (ha) of land in the western (Helena West) area of the former Midland Railway Workshop Site in Midland. Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...