Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (3) Apply Land use filter
  • Infrastructure (2) Apply Infrastructure filter
  • Iron Ore (2) Apply Iron Ore filter
  • Oil and gas (2) Apply Oil and gas filter
  • Aquaculture (1) Apply Aquaculture filter
  • Bauxite (1) Apply Bauxite filter

Filter by current status:

  • Ministerial Statement published (4) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (2) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by relevant environmental factors:

  • (-) Remove Coastal Processes filter Coastal Processes
  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Flora and Vegetation (9) Apply Flora and Vegetation filter
  • Benthic Communities and Habitats (8) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (8) Apply Marine Environmental Quality filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • Terrestrial Fauna (7) Apply Terrestrial Fauna filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Inland Waters (3) Apply Inland Waters filter
  • 37 (1) Apply 37 filter
  • Landforms (1) Apply Landforms filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • Cape Seafarms Pty Ltd (1) Apply Cape Seafarms Pty Ltd filter
  • Coral Coast Marina Development Pty Ltd (1) Apply Coral Coast Marina Development Pty Ltd filter
  • Director General of the Department of Transport on behalf of the State of Western Australia (1) Apply Director General of the Department of Transport on behalf of the State of Western Australia filter
  • Lowe Pty Ltd (1) Apply Lowe Pty Ltd filter
  • Ocean Dunes Pty Ltd (1) Apply Ocean Dunes Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter

Filter by region:

  • Pilbara (4) Apply Pilbara filter
  • Gascoyne (2) Apply Gascoyne filter
  • Perth (2) Apply Perth filter
  • Great Southern (1) Apply Great Southern filter
  • Kimberley (1) Apply Kimberley filter
  1. Home
  2. Proposal search
  3. Terrestrial Environmental Quality
  4. Coastal Processes

Outer Harbour Port Development, Kwinana

Last updated: February 4, 2025

The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...

Ridley Magnetite Project

Last updated: January 24, 2025

The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2367]

Last updated: April 16, 2024

Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

Eglington Beach Resort

Last updated: February 12, 2014

Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...

Bayonet Head Outline Development Plan

Last updated: August 9, 2013

Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...

Coral Coast Resort

Last updated: July 11, 2003

The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...

Prawn Farm at Heron Point, Exmouth Gulf

Last updated: August 28, 1997

The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...

AUSI Iron Project, Infrastructure Requirements

Last updated: June 25, 1996

The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.