Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: January 6, 2020
The City of Joondalup proposes to develop a recreational, residential, boating and tourist development, referred to as the Ocean Reef Marina Development at Ocean Reef, Western Australia. The Development is located in the Ocean Reef locality, approximately 29 km from the Perth central area. The Development is within the City and includes the existing Ocean Reef Boat Harbour. Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 6, 2019
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: November 14, 2016
The Port Rockingham Marina proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound. The EPA assessed the proposal at the level of Public Environmental Review and released its assessment report (Report 1339) in September 2009. Read more...Last updated: November 26, 2014
The proposal is for the construction of coastal structures to establish a harbour entrance to the Port Geographe Development with reduced trapping of seagrass wrack, 3 kilometres east of the town of Busselton. Inquiry under s46 regarding a review of the implementation conditions of Ministerial Statement 391 . Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...