Last updated: May 8, 2025
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The revised proposal includes the offshore disposal of dredge spoil within a dredge material placement area (DMPA), upgrading the existing airstrip and... Read more...Last updated: December 18, 2024
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: December 10, 2024
The Proposal involves the development of a greenfields Sulphate of Potash fertiliser operation which is currently designed to operate for a 20-year period. The Proposal involves the on-lake development of trenches and solar evaporation ponds for brine extraction and Sulphate of Potash production. The off-lake development includes a processing plant, associated site infrastructure and access roads for trucking Sulphate of Potash product to Wyndham Port. A northern linear access corridor will... Read more...Last updated: October 19, 2023
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: June 21, 2023
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: December 21, 2022
The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases. The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation... Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: August 9, 2021
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...Last updated: July 21, 2020
Changes to Environmental Commitment 2.2.1 related to condition 1 and condition 3, in order to change the authorised storage capacity of chlorine at the proposed site. Read more...Last updated: February 12, 2013
Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...Last updated: February 9, 2010
Straits Salt proposes to construct and operate a 4.2 million tonne per annum solar salt farm on the east coast of Exmouth Gulf. Read more...Last updated: June 17, 1999
Proposal to construct additional crystallizer ponds at the existing salt works in Useless Loop, Shark Bay. Read more...Last updated: June 14, 1999
The proposal is to construct a new series (F series) of crystallizer ponds at the northern edge of the existing Shark Bay Salt crystallizers in Useless Loop, Shark Bay. Construction of the new series of ponds will enclose approximately 125 hectares of shallow marine environment up to the boundary of Mining Lease 260 SA, of which some 60 hectares is seagrass. Read more...Last updated: November 21, 1995
Inquiry under s46 regarding amendment of conditions of Ministerial Statement 168 . The proposed changes involve the withdrawal of three conditions and consequential changes to three commitments from the 1991 statement. Onslow Salt submitted a final proposal in January 1995 (Onslow Salt Pty Ltd, 1995), which contained a detailed description and justification for the proposed changes. Read more...Last updated: August 14, 1991
The proposal is for the establishment of a solar salt facility, to produce and ship salt from the port of Onslow. The proposal seeks to establish condenser and crystalliser ponds on coastal flats near Onslow, and associated processing facilities to produce up to 1.5 million tonnes of salt a year. The salt would be loaded by conveyor onto ships which would berth at the end of a one kilometre long trestleway proposed for the vicinity of Beadon Point, immediately west of Onslow. The proposal... Read more...Last updated: November 23, 1990
The proposal is to expand the capacity of the existing Dampier salt field from 2.5 million tonnes per annum to 4 million tonnes per annum. Expansion is planned in four stages, depending on market demand, commencing in 1990 through to about 1997. Expansion would occur within the existing salt field lease boundary which has been operating at Dampier since the late 1960s. The proposed expansion is based on recovering waste salt from the disused bitterns holding pond then utilising this previously... Read more...