Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: August 14, 2019
Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: February 5, 2019
The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: December 4, 2018
The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...Last updated: November 19, 2018
Argyle Cattle Company Pty Ltd proposes to disturb up to to 1,200 ha of native vegetation for 650 ha of irrigated pasture and fodder and associated infrastructure. The proposal is located 64 km south of Broome on the Great Northern Highway, in the Shire of Broome. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: June 21, 2018
Main Roads Western Australia (MRWA) proposes to construct and maintain a new road from Northwest Coastal Highway (near Karratha), through the Millstream-Chichester National Park (NP), to the Nanutarra-Munjina Road intersection (north of Tom Price). Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...