Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: October 5, 2020
Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...Last updated: September 30, 2020
The proposal is for the continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings. This is a reassessment, pursuant to the Minister's decision to remit... Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...Last updated: July 9, 2020
Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...Last updated: July 9, 2020
Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 20, 2020
Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar. The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody. The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational... Read more...Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...