Alcoa of Australia Limited’s (Alcoa) clearing permit application (CPS 10626/1) to the Department of Energy, Mines, Industry Regulation and Safety is for the clearing of native vegetation for geotechnical investigations. Under the original CPS application, referred to the EPA, Alcoa sought to clear 20 hectares of native vegetation (ha). However, Alcoa has since amended the application to reduce the area to 11ha. The geotechnical investigations are located at Myara North which is a future mine... Read more...Last updated: November 1, 2021
The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...Last updated: October 25, 2021
Renergi Pty Ltd propose to build and operate a trial pyrolysis plant in the Shire of Collie. The rial will run for up to 2 years. The proposal involves the treatment of municipal waste and forestry waste via pyrolysis to produce a biochar, condensed bio-oil and wood vinegar. The trial plant is small scale and will be constructed within the boundary of the Collie waste facility operated by the Shire of Collie Read more...Last updated: September 21, 2020
Kelliher Bros. propose to install a 40 ha single pivot irrigation system in Meelon, Western Australia (Shire of Murray). The site is located approximately 20 km south-east of Mandurah and 5 km south east of Pinjarra, and is zoned "rural" under the Local Planning Scheme. The project site is owned by Kelliher Bros and covers an area of approximately 178 ha. It is bounded by McLarty Rd to the west, Tuckey Road to the east, Pinjarra-Williams Road to the north and other rural lots to... Read more...Last updated: August 24, 2020
King Street Trust is applying for Planning Consent and an Extractive Industries Licence for sand extraction on Lot 226, Paterson Road, Nambeelup, for a period of 10 years. Lot 226 Paterson Road is approximately 155 hectares (ha) in size. The proposal will require a total of 24.5 ha of proposed disturbance (excavation) including 12.7 ha of native vegetation clearing. The depth of excavation will be between 1 to 5 metres below natural land surface, with the rate of excavation between 50 000 and... Read more...Last updated: April 15, 2019
The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the, Environmental Protection Peel Inlet - Harvey Estuary Policy 1992, policy area. Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: December 7, 2016
The Florida Partnership is proposing to subdivide and construct the portion of Florida Beach Estate known as ‘Florida North’, which will create approximately 161 lots for residential development. The site is zoned for this purpose in the Peel Region Scheme and the City of Mandurah Town Planning Scheme. The proposed development footprint is approximately 16.73 hectares (ha) and will require clearing approximately 11.72 ha of native vegetation. Read more...Last updated: December 7, 2016
The Shire of Murray proposes to construct an approximate 650 metre section of Fiegert Road, Barragup in the vincinity of the Nambeelup Brook. In considering this proposal the EPA notes that an informal (4 wheel drive accessible) track is already in place within the existing road reserve, and infrastructure in the form of a bridge is in place over the Nambeelup Brook. Read more...Last updated: December 10, 2012
The proposal is for the marine component of the Perth Wave Energy Project (PWEP) which involves the installation of five 11 metre diameter CETO (Carnegie's wave energy technology) units 3km south west of Garden Island and laying two pipelines to transfer the energy harnessed by the CETO units to an onshore power generation facility located on Garden Island. Read more...Last updated: September 17, 2012
The proposal is to construct infill sewerage infrastructure within an existing built-up area in the location of Ravenswood. The new infrastructure would service 54 residences that are currently utilising septic tanks and leach drains and are all situated in close proximity to the Murray River. The key components of the proposal involve: construction of approximately 1.3 km of dual pressure 100 mm diameter sewer pipelines and 1.5 km of gravity sewer pipeline; construction of a 'Type 1 0... Read more...Last updated: July 16, 2012
The proposal referred to the EPA and to which this advice applies is for Landcorp's Stormwater and Drainage Management Plan for Cockburn Central Stage 2. Stormwater management for Cockburn Central Stage 2 is proposed on Lot 9504 Beeliar Drive, which is adjacent to the main development site of Cockburn Central and contains a Resource Enhancement Wetland (REW) that is also a lake listed under the Environmental Protection (Swan Coastal Plain Lakes) Policy 1992. Read more...Last updated: March 1, 1996
The Tony Scolaro Family Trust intends to redevelop an existing caravan park into a Park Home Estate. The proposal will involve the construction of new infrastructure including 120 park homes (demountable houses), associated access roads, a new wastewater treatment plan and infiltration areas for stormwater and treated wastewater. Read more...