ProjectProponent: Water CorporationProposal description: The proposal is to construct infill sewerage infrastructure within an existing built-up area in the location of Ravenswood. The new infrastructure would service 54 residences that are currently utilising septic tanks and leach drains and are all situated in close proximity to the Murray River. The key components of the proposal involve: construction of approximately 1.3 km of dual pressure 100 mm diameter sewer pipelines and 1.5 km of gravity sewer pipeline; construction of a 'Type 1 0' pumping station which would have the capacity to pump at a rate of 10 litres per second, within a wet well excavated to a depth of 9m below ground level; and various connections to the existing pressure pipeline and gravity wastewater system. Region: PeelReferred under EP Act: s38Industry sector: InfrastructureLast updated: September 17, 2012Current Status: Decision on whether to assess has been published 1. ReferralComment period: Thursday, 30 August, 2012 to Wednesday, 5 September, 2012Referral documentation: Cover letter and referral form (PDF, 1.41 MB) Appendix A - Figures (PDF, 6.65 MB) Appendix B - EIA Supporting Document (PDF, 5.57 MB) Appendix C - Draft CEMF (PDF, 4.37 MB) Appendix D - Flora and Fauna Report (PDF, 7.66 MB) Appendix E - Wetland Condition Report (PDF, 5.06 MB) 2. Decision on whether to assess this proposalChair's Determination: Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)Extract of determination: Chairman's Determination - Ravenswood/West Murray 2A lnfill Sewerage Project (PDF, 21.67 KB)Preliminary Environmental Factors: Flora and VegetationPublic advice: Public Advice - Ravenswood/West Murray 2A lnfill Sewerage Project (PDF, 67.67 KB)Date published: Monday, 17 September, 2012