FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: August 14, 2023
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA). The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier substation and the Burrup SIA, clearing of unsealed access tracks along the transmission line route, an extension of the existing Dampier substation (inclusive of 132 kV switchgear, fencing and ancillary... Read more...Last updated: July 3, 2023
The proposal is to construct and operate an extension to the Dampier Cargo Wharf at the Port of Dampier. The proposal incorporates the construction of a new (adjoining) southern section of wharf and associated mooring dolphin, dredged berth pocket and vessel manoeuvring area. The Proposal will enable larger vessels (up to Panamax class) to access the terminal and facilitate new trades and products being handled at the Port. Key construction elements of the Project include dredging, blasting,... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: April 11, 2023
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: January 9, 2023
The proposal is for the installation and operation of a Heated Overland Thermal Treatment (‘Hottpad’) system at t he Karratha liquid waste treatment plant and waste transfer station located approximately 6 kilometres south-west of Karratha. The Hottpad is intended to treat hydrocarbon-impacted ‘sludge’ from oil and gas operations in the region, that are currently transported interstate for thermal treatment. The proposal has a project life of 10 years and involves a self-sustaining smouldering... Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: July 11, 2022
The Proposal is located in the east Pilbara region of Western Australia within a development envelope of 718 ha and clearing no more than 270 ha. The Beatons Creek Gold Project is currently operating under relevant approvals and permits of the Environmental Protection Act (Part V) and Mining Act 1978 (Mining Act). The Fresh Rock Expansion proposes to mine deeper into the fresh rock resource including below the water table, enabling mining to continue at Beatons Creek. The proposal includes: •... Read more...Last updated: June 7, 2022
Alinta Energy Development Pty Ltd proposes to develop a 90 Mega Watts (MW) AC solar facility situated on Unallocated Crown Land near Alinta Energy’s existing Port Hedland Power Station located within the Boodarie Strategic Industrial Area. The proposal is located approximately 5 km south-west of South Hedland, adjacent to Great Northern Highway, within the Town of Port Hedland. The proposal consists of a 90 MW AC solar farm and a short (~2 km) transmission connection to the existing Port... Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: March 21, 2022
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: May 31, 2021
The Water Corporation propose to construct a seawater desalination plant to supply potable water to the town of Onslow, WA. Seawater intake and brine wastewater release will occur in Beadon Bay, approximately 1 km seaward from the shoreline. The desalination processing facility is to be located at Lot 551, 552 and/or 553 Beadon Creek Road, Onslow. The proposal will involve the installation of permanent subtidal infrastructure in Beadon Bay (intake head, brine diffusers and transport pipes), a... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: May 18, 2020
Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...Last updated: April 20, 2020
The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...