Last updated: May 18, 2020
Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...Last updated: May 11, 2020
The purpose of the proposal aims to continue to catch, tag, relocate and release white sharks to better understand their movements following release. A range of tiger sharks and mako sharks will also be satellite and acoustic tagged as part of this proposal. This proposal is for the continuation of the SMART (Shark Management Alert in Real Time) drumline trial for an additional 12 months (until May 2021). The trial extension will provide additional data to assist in determining the... Read more...Last updated: February 24, 2020
The Rottnest Island Authority proposes to redevelop the Rottnest Lodge on Rottnest Island, WA. The proposal will involve the demolition and/or refurbishment of existing accommodation, the construction of new accommodation and associated infrastructure. The proposal will involve clearing of up to 0.5 ha of native vegetation within the 1.8 ha development envelope. Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: October 7, 2019
The proposal aims to reduce the flow of high salinity river water entering Wellington Dam and improve the quality of dam water for irrigated agriculture in the Collie and Myalup irrigation districts. The proposal is to construct a weir, pump stations and pipeline infrastructure and take saline water from the Collie River East Branch of the Upper Collie River, construct and operate a reverse osmosis Water Treatment Plant and supply desalinated water to the Water Corporation via Harris River Dam. Read more...Last updated: September 16, 2019
The Shire of Broome is proposing to undertake an upgrade of the Town Beach Jetty as part of a set of upgrades to Broome’s Town Beach, in the Kimberley region of Western Australia. The Broome Town Beach Groyne Upgrade and Jetty Project includes upgrades to the existing groyne and the construction of a new concrete jetty extending offshore from the groyne. Piling works associated with the construction for the new concrete jetty and fishing platform would be undertaken during daylight hours for 2... Read more...Last updated: September 2, 2019
The Commissioner of Main Roads is proposing to undertake modification works within the existing Tonkin Highway Road Reserve between Guildford Road and Hepburn Avenue. The proposed modification works allow for: Future upgrade of Tonkin Highway to a four lane ‘all-lane-running’ scenario Future construction and operation of a mass transit system within the Tonkin Highway media by other agencies. The proposed modification works will require realignment and reconstruction of the Tonkin Highway Road... Read more...Last updated: June 24, 2019
The Shire of Esperance propose to demolish the heritage listed Esperance Tanker Jetty as it has fallen into disrepair and no longer deemed economically viable for the Shire to maintain. The Shire proposes to build a replacement jetty in close alignment with the old structure and extending 400m of its original 512m length. The old piles of the Tanker Jetty will be retained in-situ at mean sea level for the length of the old structure and three meters below the lowest astronomical tide past the... Read more...Last updated: June 10, 2019
The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. Read more...Last updated: May 20, 2019
The Proposal is to undertake essential maintenance works on the Cape Lambert Port A (CLA) wharf facility and associated jetty. The Proposal consists of two components, the CLA Dolphin Life Extension Project and the CLA Jetty Strengthening Project, collectively referred to as CLA Marine Structures Refurbishment Project (the Proposal). The CLA dolphins were constructed between 1972 and 2002, with recent inspections indicating that the current dolphins are near end of life and need replacement. In... Read more...Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: January 17, 2019
The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions. In doing so, it is proposed to catch, tag, relocate and release white sharks. The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park. The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with the NSW SMART... Read more...Last updated: October 15, 2018
Main Roads Western Australian (Main Roads) are proposing to upgrade sections of Armadale Road and the Kwinana Freeway in the City of Cockburn (the Proposal). The Proposal is to: realign and extend Armadale Road from Solomon Road to North Lake Road; duplicate and upgrade intersections along Armadale Road between Solomon Road and Ghostgum Avenue; construct a new bridge and on/off ramps over Kwinana Freeway; and construct a southbound collector distributor road along the Kwinana Freeway between... Read more...Last updated: May 28, 2018
The Shire of Broome is proposing to construct a revetment wall at Broome Town Beach to mitigate the extreme level erosion risk identified for the east side of the Town Beach foreshore reserve, Pioneer Cemetery and the Museum. The revetment wall extends along approximately 400 m of shoreline and includes associated footpaths, drainage and lighting. Read more...Last updated: May 14, 2018
Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: April 16, 2018
Johns Creek Boat Harbour is a small facility located at Point Samson, 40 km east of Karratha. Dredging of the Boat Harbour and Entrance Channel is required to restore navigable depths, and is planned for autumn 2018. Maintenance dredging is proposed to occur within the Boat Harbour and Entrance Channel, with disposal to a sandbank about 1 km south of the Boat Harbour (Western Disposal area). Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: February 5, 2018
AME is proposing to expand the existing facility in Henderson and further develop the waterfront infrastructure by dredging within an area of the Northern Harbour, Jervoise Bay. The proposal is immediately adjacent to the AME site (49 Clarence Beach Road, Henderson) and proposes to utilise the dredge sediments to create a land-backed wharf. Read more...