This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 12, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: February 15, 2024
Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: February 10, 2020
GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...Last updated: March 26, 2019
The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...