This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 6, 2002
Proposal by the Midland Redevelopment Authority (MRA) to remediate 22 hectare (ha) of land which includes a portion of the former Midland Railway Workshop Site (Area E) within the Clayton Precinct, Clayton Street road extension and the Helena Street and Viveash Road rail crossings outside of the Clayton Precinct in Midland. Read more...Last updated: April 4, 2000
The proposal is to construct and operate an extension to the Bibra Lake Main Sewer. Read more...Last updated: March 13, 2000
Subdivision of Lots 1 and 2 Baldivis Road, City of Rockingham. Read more...Last updated: February 24, 2000
Inquiry under section 46 of the, Environmental Protection Act 1986, to change condition 4 of the existing environmental conditions relating to Tonkin Industrial Park Stage II development to be changed to allow the proponent to remediate the Tonkin Park Stage II site in Bassendean by the use of one or a combination of the following remediation options: Containment on site and/or Disposal at a landfill site Read more...Last updated: October 29, 1999
Proposal to redevelop the Harvey and Stirling Reservoir system in order to divert an additional quantity of water from the Harvey Basin for the Perth Metropolitan Water Supply Scheme (PMWSS). The proposal involves the construction of a new pipeline from Harris Sam to Stirling Reservoir to enable transfer of water. Read more...Last updated: October 17, 1999
Proposal to deviate the alignment of Kalamunda Road around the southern perimeter of the Guildford Cemetery. Read more...Last updated: July 22, 1999
Saracen Properties Pty Ltd propose to construct and operate a brick and tile manufacturing plant in Hazelmere, south of the Midland town center, approximately 16 km north-east of the Perth metropolitan area. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: April 27, 1999
The proposal is to subdivide lots 5,8,9 and 10 Haigh Road (Garden Street) and lots 15 and 16 Shreeve Road, Canning Vale (City of Gosnells) for residential purposes. The subdivision has a gross area of approximately 12 hectares. It includes approximately 150 single residential lots ranging in size from around 480 square metres to around 815 square metres, several duplex size lots, public open space and roads. Read more...Last updated: April 27, 1999
The proposal is to subdivide for residential purposes Lot 11 Bridge road and Lot 6 Haigh Road, Canning Vale. The subdivision has a gross area of approximately 3.2 hectares. It includes approximately 27 single residential lots ranging in size from around 540 square metres, several duplex size lots, public open space and roads. Read more...Last updated: October 9, 1998
The proposal is to manage the environmental impact of a former liquid waste disposal site in Southern River Road, Gosnells. The site includes 13 unlined lagoons constructed from sand. Discharges to the lagoons included primarily septage and brewery wastes, however unknown quantities of other wastes were also discharged. Read more...Last updated: September 18, 1998
The proposal is for the subdivision of part Lot 402, Rae Road, Rockingham for Residential and Commercial Purposes and the ceding of the Parks and Recreation reserve and the important regional road reserve to the Crown. Read more...Last updated: August 21, 1998
The Water Corporation proposes to construct a 500mm-600mm diameter pressure sewer main and associated pump station to service the sewage requirements of residential development within the vicinity of the Ellenbrook Development located 26km north of the Perth CBD. Read more...Last updated: May 5, 1998
The proposal is to develop a soccer and recreation facility at lot 14 Progress Drive, Bibra Lake. The development is proposed for council owned land, within the Beliar Regional Park and System 6 Reserve M93 and the land proposed to be developed is zoned "Parks and Recreation". Read more...Last updated: April 6, 1998
The proposal is to rehabilitate the silica and concrete sand mine pit at Lot 166 Clifton Road, Canning Vale by establishing a golf course and recreation park. The proposal also includes an application to the Water and Rivers Commission for a well license to irrigate the proposed golf course. The site is located within the proclaimed Priority 2 Underground Water Pollution Control Area (UWPCA) of the Jandakot Water Mound and is within a Public Water Supply well field. Read more...Last updated: December 19, 1997
The proposal is to manage an additional 67 ,500m 3 of contaminated material as part of the rehabilitation of former industrial land at McCabe Street, Mosman Park . Clean-up of this industrial land commenced in 1995 and has been subject to three previous assessments (EPA Bulletins 324, 699 and 807). The proponents are seeking to amend the existing conditions of approval ( Ministerial Statement 338 ) under Section 46 of the, Environmental Protection Act 1986, to allow for disposal of the... Read more...Last updated: November 21, 1997
The proposal is to establish Class IV waste disposal cells at the proponent's existing Red Hill Waste Disposal Facility. These waste cells would provide for the disposal of low hazard wastes, including contaminated soils and household hazardous wastes, within the Perth metropolitan area. The facility is located approximately 12 km north east of Midland on Toodyay Road, Red Hill. Read more...Last updated: July 15, 1997
Main Roads of Western Australia has proposed to build further portions of the Roe Highway from Welshpool Road, Beckenham to South Street, Canning Vale. Main Roads has indicated that Roe Highway will provide access to areas of manufacturing concentration and access to the termini of National Highways, airports, ports, freight forwarding centres and major rail heads. In summary, Roe Highway along with Reid and Tonkin Highways, will join other arterial roads to provide easy access to these... Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: May 26, 1997
Mrs A MMW Bennett proposes to dredge a portion of the Swan River to provide access for a 25 m long motor boat to an underground private boatshed at Lot 55 Saunders Street Mosman Park. Access to the boatshed would involve cutting a channel through a portion of foreshore land privately owned to High Water Mark but reserved for 'Parks and Recreation'. Public access is proposed to be maintained along the foreshore across the channel via swing footbridge. Read more...