This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: November 30, 2016
The Department of Minerals and Petroleum has referred a Programme of Work application. The application, from Holcim (Australia) Pty Ltd, is to undertake an air core drilling exploration programme on M70/1248 and M70/1250. The exploration site is cleared pine plantation to the East of Lake Jandabup. Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: September 1, 2016
The Public Transport Authority of Western Australia proposes the Forrestfield-Airport Link, a 9km extension of the Perth rail network from Bayswater to Forrestfield. Read more...Last updated: July 4, 2016
Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...Last updated: February 15, 2016
Holcim (Australia) Pty Ltd proposes to develop a sand quarry on tenements M70/1248 and M70/1250, located in Jandabup north of Perth, approximately 8 km north east of Wanneroo and within the Local Government Area of Wanneroo. The site falls within the Gnangara Pine Plantation, which has been progressively harvested since 2003 until the current time. The site is in a cleared state from a recent harvest of pine. The project site is on the Gnangara Mound within the Gnangara Underground Water... Read more...