This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 24, 2007
The proposal is to upgrade the Worsley alumina refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). This is an inquiry under section 46 of the, Environmental Protection Act 1986, into a request to amend the conditions of Ministerial Statement 719 . Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: April 22, 2007
The proposal is to raise the application rate for total nitrogen from 106 to 150 kg/ha/y to the area of irrigated trees on the tree farm. Inquiry under s46 into changes to Ministerial Statement 287 . The original proposal, assessed in 1992, calculated nitrogen loadings in the wastewater applied to the grass bays and the irrigated trees at the wastewater disposal site. The projected loadings were based on the wastewater treatment plant being upgraded to reduce nitrogen concentrations in the... Read more...Last updated: March 28, 2007
Greendene Development Corporation Pty Ltd proposes to subdivide an area of land (Locations 9002 and 9101) within the developing Riverslea residential area, one kilometre east of the Margaret River townsite. Read more...Last updated: January 23, 2007
The Cloverdale Mineral Sands proposal, located approximately 190km south of Perth in the Shires of Busselton and Capel, consists of two strands of heavy mineral deposits, 4.5km long. The proposal involves the progressive mining of approximately 3.5 million tonnes of resource, with an average grade of 18% heavy mineral concentrate (HMC), over the two-year life of the mine. The Cloverdale proposal area lies parallel and adjacent to the existing Yoganup West and Yoganup mine sites. The major... Read more...