This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 5, 2024
Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...Last updated: October 7, 2024
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: April 24, 2024
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: February 23, 2024
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: January 29, 2024
The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre. Read more...Last updated: July 8, 2022
Theia Energy No.1 Pty Ltd (the Proponent) proposes to drill two exploration wells (one vertical and one horizontal) and undertake hydraulic fracture stimulation of the horizontal well within Petroleum Exploration Permit EP493 located in the Canning Basin, 155km South-east of Broome. The Proposal involves an extension of the existing well site and camp site, drilling of two exploration wells (Theia-2V and Theia-3H), hydraulic fracture stimulation (HFS) and flow-test of Theia-3H. The Proposal... Read more...Last updated: September 1, 2021
Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: December 2, 2020
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: May 12, 2014
A 2,000 hectare aquaculture development zone located within Cone Bay, as defined by spatial coordinates provided in Table 2 of Schedule 1, as represented in Figure 1 and described in Table 1 of Schedule 1 (Kimberley Aquaculture Development Zone) with a maximum production capacity of 20,000 tonnes per annum of marine finfish of a species that occurs naturally within the Pilbara and Kimberley Region. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: October 27, 1993
Within its existing mining tenements Poseidon Bow River Diamond Mine Limited (Poseidon) proposes to extend its alluvial diamond mining operation into areas where ongoing exploration has defined economically viable alluvial reserves of diamonds. The mine and tenements are located at the southern end of Lake Argyle on Lissadell Station about 205 km from Kununurra by road. The original mining proposal was not assessed under Part IV of the, Environmental Protection Act 1986, , but environmental... Read more...