Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (6) Apply Infrastructure filter
  • Oil and gas (5) Apply Oil and gas filter
  • Industrial (2) Apply Industrial filter
  • Iron Ore (2) Apply Iron Ore filter
  • Salt (2) Apply Salt filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter

Filter by relevant environmental factors:

  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Flora and Vegetation (8) Apply Flora and Vegetation filter
  • Terrestrial Fauna (8) Apply Terrestrial Fauna filter
  • Benthic Communities and Habitats (7) Apply Benthic Communities and Habitats filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • 37 (4) Apply 37 filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Inland Waters (3) Apply Inland Waters filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • People (1) Apply People filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Dampier Nitrogen Pty Ltd (1) Apply Dampier Nitrogen Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2013 (2) Apply 2013 filter
  • 2005 (1) Apply 2005 filter
  • 2002 (1) Apply 2002 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Marine Environmental Quality
  5. Terrestrial Environmental Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Ridley Magnetite Project

Last updated: August 4, 2025

The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...

Eramurra Solar Salt Project

Last updated: June 19, 2025

Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2367]

Last updated: April 16, 2024

Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland

Last updated: January 25, 2022

Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...

Eramurra Industrial Salt Project

Last updated: August 9, 2021

Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Ammonia-Urea Plant, Burrup Peninsula

Last updated: October 12, 2005

The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...

Hope Downs Iron Ore Project - Rail and Port Facility, Pilbara

Last updated: December 6, 2002

Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...

AUSI Iron Project, Infrastructure Requirements

Last updated: June 25, 1996

The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...

East Spar Off-Shore Gas Field Development Varanus Island, North West Shelf

Last updated: September 8, 1995

The proposal is to develop the East Spar offshore gas field, located in Commonwealth waters approximately 50 kilometres west of Barrow Island. Processing facilities would be constructed and operated on Varanus Island immediately adjacent to the existing Harriet Joint Venture facilities on the island. A new submarine pipeline would bring gas/condensate from the gas field to the processing facilities. The existing Harriet Joint Venture export pipeline would carry gas to the trunkline on the... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.