This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 12, 2007
A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...Last updated: July 2, 2007
The main features of the proposal are to; extend the existing northern and southern berth pockets at the Parker Point wharf and to enable four vessels (two on the north side and two on the south side) to moor alongside the wharf at any one time, although only two vessels can be loaded at any one time; widen and deepen the southern swing basin to provide safe approaches for 220,000 DWT vessels using the southern berths; widen the northern approach route to provide safe navigation for arriving... Read more...Last updated: September 29, 2004
The proposal involves the construction, deepening and extension of shipping channels, a swing basin and berth pockets for the passage and docking of ships by dredging of approximately 3.1 million cubic metres of earth and rock material from the sea bottom. The dredge materials will be disposed of to designated sites on land and on the ocean floor. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: July 14, 1998
The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...Last updated: July 14, 1997
The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...Last updated: June 19, 1997
The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...Last updated: June 25, 1996
The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...Last updated: August 24, 1993
The proposal is to establish additional facilities for liquefied petroleum gas (LPG) extraction and export within the existing onshore treatment plant at the Burrup Peninsula. The existing Gas Treatment Plant occupies 231ha on a lease at Withnell Bay, near Dampier on the Burrup Peninsula about 1,300km north of Perth. The area within the lease has undergone major development, with the portions of Plant constructed to date consisting of a domestic gas plant, a liquefied natural gas (LNG) plant,... Read more...Last updated: October 25, 1991
Western Australian Petroleum Pty Ltd (WAPET) is operator for the participants in Exploration Permit No. TP/3 Part 1. WAPET has already drilled some 18 wells within the Permit Area, has developed the Saladin, Cowle and Yammaderry oilfields and is currently seeking approval to develop the Roller Oilfield. Over the next five year period, WAPET proposes to drill a further four to twelve exploratory wells within Permit Area TP/3 Part 1. Read more...