This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions. Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 24, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: October 14, 2024
The Proposal occurs approximately 20 kilometres north of Karratha within an existing industrial area designated as a service corridor within the Burrup Strategic Industrial Area of the Burrup Peninsula. The Project involves the construction of a 550 meter pipeline and associated supporting infrastructure to transport a maximum of 150 TJ of natural gas per day from the Dampier to Bunbury Natural Gas Pipeline to the proposed Perdaman Urea Plant development. The key components of the Proposal... Read more...Last updated: July 15, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 26, 2024
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...