Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (5) Apply Iron Ore filter
  • Gold (2) Apply Gold filter
  • Salt (2) Apply Salt filter
  • Copper (1) Apply Copper filter
  • Infrastructure (1) Apply Infrastructure filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter

Filter by relevant environmental factors:

  • Flora and Vegetation (9) Apply Flora and Vegetation filter
  • Terrestrial Fauna (7) Apply Terrestrial Fauna filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (4) Apply Marine Environmental Quality filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • 37 (3) Apply 37 filter
  • Inland Waters (3) Apply Inland Waters filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (2) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • Calidus Resources Ltd (1) Apply Calidus Resources Ltd filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hastings Technology Metals Ltd (1) Apply Hastings Technology Metals Ltd filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Newcrest Operations Limited (1) Apply Newcrest Operations Limited filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Water Corporation (1) Apply Water Corporation filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • (-) Remove 2021 filter 2021
  1. Home
  2. Proposal search
  3. Pilbara
  4. 2021

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

North Star Magnetite Project

Last updated: December 24, 2021

The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...

Havieron Underground Mine Project

Last updated: December 22, 2021

The Havieron Underground Mine Project (the Project) is a greenfield gold-copper deposit operated located in the East Pilbara Shire of Western Australia, and is approximately 45 kilometres (km) east of Newcrest’s Telfer Gold Mine and 450 km east south east from the town of Port Hedland. The Project involves the development and operation of an underground mine with transport of ore to Telfer Gold Mine for processing. The underground mine and associated infrastructure includes; clearing of 530 ha... Read more...

Mardie Project

Last updated: November 24, 2021

Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...

Yangibana Expansion 1

Last updated: September 14, 2021

Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...

Warrawoona Gold Project

Last updated: September 14, 2021

The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Sino Iron Mine Continuation Proposal

Last updated: September 1, 2021

The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...

Eramurra Industrial Salt Project

Last updated: August 9, 2021

Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...

Sino Iron Mine Continuation (S46) [2271]

Last updated: June 10, 2021

Delete conditions 8-4, 8-5, 8-6, 8-7 (Marine Wastewater Outfall) relating to the management of the marine wastewater outfall for the desalination plant. Amend condition 8-8 to remove reference to conditions 8-4 and 8-5. Read more...

Onslow Seawater Desalination Plant

Last updated: May 31, 2021

The Water Corporation propose to construct a seawater desalination plant to supply potable water to the town of Onslow, WA. Seawater intake and brine wastewater release will occur in Beadon Bay, approximately 1 km seaward from the shoreline. The desalination processing facility is to be located at Lot 551, 552 and/or 553 Beadon Creek Road, Onslow. The proposal will involve the installation of permanent subtidal infrastructure in Beadon Bay (intake head, brine diffusers and transport pipes), a... Read more...

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Western Turner Syncline Iron Ore Project - Revised Proposal

Last updated: January 4, 2021

Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.