Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (2) Apply Infrastructure filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter
  • Power generation (1) Apply Power generation filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • (-) Remove Assessment has been terminated under s40A of the EP Act filter Assessment has been terminated under s40A of the EP Act

Filter by relevant environmental factors:

  • Social Surroundings (5) Apply Social Surroundings filter
  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • 37 (2) Apply 37 filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Inland Waters (2) Apply Inland Waters filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • Newcrest Mining Limited (1) Apply Newcrest Mining Limited filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2024 (1) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Assessment has been terminated under s40A of the EP Act

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Multi-User Iron Ore Export (Landside) Facility Port Hedland (S46) [2349]

Last updated: February 19, 2024

The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...

Uaroo Renewable Energy Hub

Last updated: October 18, 2023

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...

Eramurra Industrial Salt Project

Last updated: August 9, 2021

Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...

Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Last updated: April 6, 2020

Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Telfer Project

Last updated:

The Telfer mine is a gold/copper mine located in the Great Sandy Desert in the Paterson Province of Western Australia, approximately 485km east southeast of Port Hedland. The proponent referred this request to consolidate Ministerial Statements 605, which relates to power supply and an infrastructure corridor, and 606, which relates to the mining , processing, and transport of ore and concentrate. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.