This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: December 8, 2016
Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: November 22, 2016
The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: February 15, 2016
Holcim (Australia) Pty Ltd proposes to develop a sand quarry on tenements M70/1248 and M70/1250, located in Jandabup north of Perth, approximately 8 km north east of Wanneroo and within the Local Government Area of Wanneroo. The site falls within the Gnangara Pine Plantation, which has been progressively harvested since 2003 until the current time. The site is in a cleared state from a recent harvest of pine. The project site is on the Gnangara Mound within the Gnangara Underground Water... Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...