Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (8) Apply Iron Ore filter
  • Infrastructure (7) Apply Infrastructure filter
  • Land use (5) Apply Land use filter
  • Mineral sands (1) Apply Mineral sands filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (13) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (2) Apply Minister determined that the proposal should not be implemented filter

Filter by relevant environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • Flora and Vegetation (14) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (13) Apply Inland Waters Environmental Quality filter
  • Terrestrial Fauna (12) Apply Terrestrial Fauna filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Subterranean Fauna (4) Apply Subterranean Fauna filter
  • 37 (1) Apply 37 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • Marine Fauna (1) Apply Marine Fauna filter

Filter by Proponent:

  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • BEMAX Resources Limited (1) Apply BEMAX Resources Limited filter
  • BGC (Australia) Pty Ltd (1) Apply BGC (Australia) Pty Ltd filter
  • Brockman Iron Pty Ltd (1) Apply Brockman Iron Pty Ltd filter
  • Burswood Nominees Limited (1) Apply Burswood Nominees Limited filter
  • City of Greater Geraldton (1) Apply City of Greater Geraldton filter
  • City of Subiaco (1) Apply City of Subiaco filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Department of Treasury - Strategic Projects (1) Apply Department of Treasury - Strategic Projects filter
  • FerrAus Pty Limited (1) Apply FerrAus Pty Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Lowe Pty Ltd (1) Apply Lowe Pty Ltd filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Mr G M and Mrs C M White (1) Apply Mr G M and Mrs C M White filter
  • PIOP Mine Co NL (1) Apply PIOP Mine Co NL filter
  • The Minister for State Development (1) Apply The Minister for State Development filter

Filter by region:

  • Pilbara (8) Apply Pilbara filter
  • Perth (4) Apply Perth filter
  • South West (2) Apply South West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Great Southern (1) Apply Great Southern filter
  • Kimberley (1) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2013 filter 2013
  1. Home
  2. Proposal search
  3. Hydrological Processes
  4. 2013

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

FerrAus Pilbara Project

Last updated: December 31, 2013

The proposal is to expand the FerrAus Pilbara Project to include below the water table mining at the Robertson Range Area and to develop additional mine pits at the Davidson Creek Area, located in the East Pilbara region of Western Australia. Read more...

Proposed Forest Management Plan 2014 - 2023

Last updated: November 21, 2013

Read more...

Hope Downs Iron Ore Mine

Last updated: November 7, 2013

To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Ularring Hematite Project

Last updated: October 24, 2013

The proposal is to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 kilometres (km) east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60km west of the mine site and a rail siding 130km east of the mine site and 8km south of Menzies. Read more...

Brockman 2 Detrital Iron Ore Mine Extension Phase 2B

Last updated: September 11, 2013

The Brockman 2 Detrital Iron Ore Mine (B2 Project) commenced mining operations in 1992 in the central Pilbara region of Western Australia. It is located in the Brockman Syncline area, approximately 55 kilometres (km) northwest of Tom Price. Ore from the mine is currently exported through Dampier and Cape Lambert ports. This proposal is for the Phase 2B development of the B2 Project and involves further development of parts of the existing Pit 4 Extension, Lower Pit 4, Valley Pit and Pit 6 to an... Read more...

Happy Valley Titanium Minerals Project

Last updated: September 9, 2013

The proposal is to develop a mineral sand mining proposal in the Shire of Capel on the Whicher Scarp, 10 km south of the town of Boyanup. The two deposits (northern and southern) contain over 750,000 tonnes of recoverable heavy mineral concentrate and would be mined using open cut, dry mining techniques involving heavy earthmoving equipment and processed through screening and separation plants. This proposal will involve the clearing of 146 ha of native vegetation. Read more...

Turee Syncline Iron Ore Project

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Turee Syncline deposit, located approximately 30 kilometres north-east of Paraburdoo. Read more...

Bayonet Head Outline Development Plan

Last updated: August 9, 2013

Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...

Mulga Downs Project

Last updated: August 6, 2013

Hancock Prospecting Pty Ltd proposes to develop a new Direct Shipping Ore iron ore mine at Murray's Hill in the Pilbara, and will extract iron ore at a rate of up to 5 million tonnes per annum. Mining is proposed above the water table and no dewatering will be required. The project consists of one mine pit, waste dump, crushing and screening plant, accommodation plant, and associated infrastructure., Note: This proposal is now referred to as the ‘Murray’s Hill Project’ and is a separate... Read more...

Subdivision proposal - Lot 504 Lexia Avenue, Upper Swan, City of Swan

Last updated: July 17, 2013

The proposal is to subdivide Lot 504 Lexia Avenue, Upper Swan into three rural lots.  The EPA considers that the proposal, as described, cannot meet the EPA’s environmental objectives for: specially protected (threatened) fauna; regionally significant vegetation, wetlands and watercourses; and surface water quality and quantity. Read more...

Ord River Irrigation Area Stage 2 (M2 supply channel) (s. 46) [1941]

Last updated: June 12, 2013

Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...

Voyager Quarry, Lots 11 & 14 Horton Road, The Lakes, Avon Location 1881, Shire of Northam (s46) [1931]

Last updated: April 29, 2013

The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...

Management of water levels in Lake Jualbup

Last updated: March 18, 2013

The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...

Crown Towers Project

Last updated: March 13, 2013

Burswood Nominees Ltd intends to develop a 25 storey hotel addition at their integrated Crown Perth complex in Perth. The development will comprise two distinct areas: the Towers, which will accommodate a total of 500 rooms; and the low-rise Podium, which will contain a large convention and meeting complex, restaurants, retail and public spaces. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Brockman Railway Infrastructure Project

Last updated: January 11, 2013

Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...

New Perth Stadium Project

Last updated: January 11, 2013

The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...

Flinders Pilbara Iron Ore Project – Stage 1

Last updated: January 11, 2013

The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...

Waste disposal site at Narngulu (Meru Waste Disposal Facility) (s. 46)

Last updated: January 7, 2013

Waste Disposal Site at Narngulu (Meru) Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.