This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 13, 2024
The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...Last updated: September 6, 2022
Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: July 28, 2021
Hanson Australia Pty Ltd (formerly Rocla Pty Ltd) proposes to extract sand within Bush Forever Site 390, on mining tenements M70/1142 and M70/1088 approximately 20km South of Perth at Lot 467 Jandakot Road, Banjup (City of Cockburn). The proposal would include: - a development envelope of 9.56 hectares (ha), including 5.63 ha that has been historically cleared; - clearing of 3.93 ha of native vegetation; - sand extraction of 300,000 tonnes over a period of approximately three years; - dry... Read more...Last updated: September 2, 2019
Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: December 8, 2016
PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: July 4, 2016
Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...Last updated: May 13, 1992
An application for Renewal of Excavation Licence by Midland Brick Company Ltd was referred to the Environmental Protection Authority by the Shire of Swan in August 1990. the Authority assessed the environmental impact of the proposal by way of a Consultative Environmental Review in conjunction with four other nearby clay excavation proposals which, together with this proposal were thought to potentially impact on Ellen Brook Nature Reserve and to have common regional issues of rehabilitation... Read more...