This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 14, 2024
Caravel Minerals Limited is seeking to develop the Caravel Copper Project, located in the Western Australian (WA) Wheatbelt approximately 150 km north of Perth. The Proposal will produce copper concentrate, which will be transported to port by road. The Proposal includes mine pits, waste rock landforms, tailings storage, ore processing and transfer infrastructure and associated infrastructure such as workshops, laydown areas, landfill, communications, offices, ablutions, wastewater treatment,... Read more...Last updated: May 22, 2023
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: November 20, 2013
Portman Iron Ore Limited proposes to expand the existing Koolyanobbing iron ore mine by commencing new mining at Windarling Range and Mt Jackson and linking the new minesites to Koolyanobbing by a haul road or railway. Read more...Last updated: January 22, 2013
Establishment of an Industrial Park at Meenaar 18 km east of Northam - Inquiry under s46 of the, Environmental Protection Act 1986, to remove the entire implementation conditions and proponent commitments of Ministerial Statement 293. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: November 1, 1991
Proposal to establish a cereal straw and waste paper pulp and paper mill near Moora in the Central Midlands district of Western Australia. Read more...