Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Infrastructure (3) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (9) Apply Ministerial Statement published filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Terrestrial Fauna (11) Apply Terrestrial Fauna filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • 37 (4) Apply 37 filter
  • Inland Waters (4) Apply Inland Waters filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Human Health (3) Apply Human Health filter
  • 3144 (2) Apply 3144 filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (2) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • AGI Operations Pty Limited (1) Apply AGI Operations Pty Limited filter
  • Bennett Resources Pty Ltd (1) Apply Bennett Resources Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Empire Oil Company (WA) Limited (1) Apply Empire Oil Company (WA) Limited filter
  • RCMA Australia Pty Ltd (1) Apply RCMA Australia Pty Ltd filter
  • Strike West Pty Ltd (1) Apply Strike West Pty Ltd filter
  • Theia Energy No.1 Pty Ltd (Trading name Theia Energy Pty Ltd) (1) Apply Theia Energy No.1 Pty Ltd (Trading name Theia Energy Pty Ltd) filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Kimberley (3) Apply Kimberley filter
  • Mid West (3) Apply Mid West filter
  • Perth (1) Apply Perth filter
  • South West (1) Apply South West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • 2024 (5) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2013 (1) Apply 2013 filter
  • 2008 (1) Apply 2008 filter
  • 2005 (2) Apply 2005 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. Terrestrial Environmental Quality
  4. Oil and gas

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

West Erregulla Processing Plant and Pipeline

Last updated: November 25, 2024

AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...

Valhalla Gas Exploration and Appraisal Program

Last updated: October 7, 2024

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

West Erregulla Field Development Program

Last updated: July 8, 2024

Strike West Pty Ltd propose to extract gas from the West Erregulla gas field by constructing and operating a gathering system to connect its gas field and convey the extracted gas to an upstream separating facility. The proposal will supply gas to a third party operated gas processing facility, subject to separate approvals. The proposal is located within the Shires of Three Springs and Mingenew in the Midwest region of Western Australia, approximately 50 kilometres (km) south-east of Dongara... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2367]

Last updated: April 16, 2024

Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

Theia-3H exploration well stimulation program

Last updated: July 8, 2022

Theia Energy No.1 Pty Ltd (the Proponent) proposes to drill two exploration wells (one vertical and one horizontal) and undertake hydraulic fracture stimulation of the horizontal well within Petroleum Exploration Permit EP493 located in the Canning Basin, 155km South-east of Broome. The Proposal involves an extension of the existing well site and camp site, drilling of two exploration wells (Theia-2V and Theia-3H), hydraulic fracture stimulation (HFS) and flow-test of Theia-3H. The Proposal... Read more...

Cervantes-01 Conventional Well Drilling Proposal

Last updated: December 14, 2021

RCMA Australia is proposing to drill one conventional oil exploration well to determine if there is oil in the prospect, located 11 kilometres (km) south of Dongara / Port Denison in the onshore Perth Basin, within the Beekeepers Nature Reserve. The proposal includes all activities associated with drilling a conventional oil exploration well including site preparation, equipment mobilisation, drill, case and cement, decommissioning, demobilisation, site restoration and rehabilitation. The... Read more...

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Mullering 3D Onshore Seismic Survey

Last updated: February 7, 2008

Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...

Southern Looping Project, Loop 10, south of Kwinana

Last updated: December 28, 2005

The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...

Kemerton Lateral Gas Pipeline

Last updated: November 29, 2005

The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...

East Spar Off-Shore Gas Field Development Varanus Island, North West Shelf

Last updated: September 8, 1995

The proposal is to develop the East Spar offshore gas field, located in Commonwealth waters approximately 50 kilometres west of Barrow Island. Processing facilities would be constructed and operated on Varanus Island immediately adjacent to the existing Harriet Joint Venture facilities on the island. A new submarine pipeline would bring gas/condensate from the gas field to the processing facilities. The existing Harriet Joint Venture export pipeline would carry gas to the trunkline on the... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.