Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (62) Apply Iron Ore filter
  • Infrastructure (13) Apply Infrastructure filter
  • Copper (3) Apply Copper filter
  • Gold (3) Apply Gold filter
  • Industrial (2) Apply Industrial filter
  • Oil and gas (2) Apply Oil and gas filter
  • Salt (2) Apply Salt filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter
  • Power generation (1) Apply Power generation filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • Ministerial Statement published (48) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (15) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals open (4) Apply EPA Report and Recommendations released - appeals open filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (3) Apply Environmental Scoping Document approved filter
  • Assessment on Proponent Information – public submission period closed (2) Apply Assessment on Proponent Information – public submission period closed filter
  • Response to submission published (2) Apply Response to submission published filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter

Filter by relevant environmental factors:

  • (-) Remove Subterranean Fauna filter Subterranean Fauna
  • Flora and Vegetation (75) Apply Flora and Vegetation filter
  • Terrestrial Fauna (63) Apply Terrestrial Fauna filter
  • Social Surroundings (43) Apply Social Surroundings filter
  • Hydrological Processes (30) Apply Hydrological Processes filter
  • Inland Waters (30) Apply Inland Waters filter
  • Inland Waters Environmental Quality (25) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (12) Apply Terrestrial Environmental Quality filter
  • 37 (10) Apply 37 filter
  • Landforms (9) Apply Landforms filter
  • 3144 (7) Apply 3144 filter
  • Greenhouse Gas Emissions (6) Apply Greenhouse Gas Emissions filter
  • Marine Fauna (5) Apply Marine Fauna filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Air Quality (2) Apply Air Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Human Health (1) Apply Human Health filter
  • People (1) Apply People filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (8) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (7) Apply Hamersley Iron Pty Limited filter
  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (4) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Company Pty Ltd (3) Apply Robe River Mining Company Pty Ltd filter
  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Hamersley HMS Pty Limited (2) Apply Hamersley HMS Pty Limited filter
  • Hancock Prospecting Pty Ltd (2) Apply Hancock Prospecting Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (2) Apply Hope Downs Management Services Pty Ltd filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (2) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Roy Hill Iron Ore Pty Ltd (2) Apply Roy Hill Iron Ore Pty Ltd filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Atlas Iron (1) Apply Atlas Iron filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • Atlas Iron Ltd (1) Apply Atlas Iron Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Australian Aboriginal Mining Corporation Pty Ltd (1) Apply Australian Aboriginal Mining Corporation Pty Ltd filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Bungaroo South Pty Ltd (1) Apply Bungaroo South Pty Ltd filter
  • Consolidated Minerals Pty Ltd (1) Apply Consolidated Minerals Pty Ltd filter
  • De Grey Mining Ltd (1) Apply De Grey Mining Ltd filter
  • FerrAus Pty Limited (1) Apply FerrAus Pty Limited filter
  • FMG (1) Apply FMG filter
  • FMG Iron Bridge (Aust) Pty Ltd (1) Apply FMG Iron Bridge (Aust) Pty Ltd filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Hamersley Iron – Yandi Pty Limited (1) Apply Hamersley Iron – Yandi Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hastings Technology Metals Ltd (1) Apply Hastings Technology Metals Ltd filter
  • Kalium Lakes Potash Pty Ltd (1) Apply Kalium Lakes Potash Pty Ltd filter
  • Mineralogy Pty Ltd (1) Apply Mineralogy Pty Ltd filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • Mount Bruce Mining Pty Ltd (1) Apply Mount Bruce Mining Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • PIOP Mine Co NL (1) Apply PIOP Mine Co NL filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) (1) Apply Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) filter
  • Readymix Holdings Pty Limited (1) Apply Readymix Holdings Pty Limited filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Rhodes Ridge Management Services Pty Ltd (1) Apply Rhodes Ridge Management Services Pty Ltd filter
  • Rio Tinto Pty Ltd (1) Apply Rio Tinto Pty Ltd filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Robe River Mining Co. Pty Ltd. (1) Apply Robe River Mining Co. Pty Ltd. filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • The Pilbara Infrastructure Pty Ltd (1) Apply The Pilbara Infrastructure Pty Ltd filter
  • Venturex Resources Limited (1) Apply Venturex Resources Limited filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • 2025 (12) Apply 2025 filter
  • 2024 (12) Apply 2024 filter
  • 2023 (8) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (7) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (5) Apply 2016 filter
  • 2015 (5) Apply 2015 filter
  • 2014 (4) Apply 2014 filter
  • 2013 (10) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (2) Apply 2009 filter
  • 2006 (3) Apply 2006 filter
  1. Home
  2. Proposal search
  3. Subterranean Fauna
  4. Pilbara

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Marandoo Mine Phase 2

Last updated: June 4, 2014

The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps. Read more...

Gorgon Gas Development - Additional Construction Laydown and Operations Support Area

Last updated: April 2, 2014

Chevron Australia Pty Ltd proposes to clear an additional 32 hectares of land within a 36 hectare development envelope on Barrow Island. The clearing is for the purposes of an additional construction laydown and operations support area, required to support the construction and operation of the Gorgon Gas Development referred to in Ministerial Statement 800 dated 10 August 2009 and Ministerial Statement 865 dated 8 June 2011. Read more...

FerrAus Pilbara Project

Last updated: December 31, 2013

The proposal is to expand the FerrAus Pilbara Project to include below the water table mining at the Robertson Range Area and to develop additional mine pits at the Davidson Creek Area, located in the East Pilbara region of Western Australia. Read more...

Western Turner Syncline - Section 10 Iron Ore Mine

Last updated: December 10, 2013

The proposal involves the development of a satellite iron ore mine at Section 10, 20km northwest of the Tom Price minesite, to supplement falling production from the Tom Price mine as it nears the end of its life. The orebody occupies the lower slopes of the main range of hills in the Western Turner Syncline. The eastern and western portions of the proposed pit, where the ore is shallowest, would be mined first and subsequently backfilled, but the central portion would remain open. Read more...

Hope Downs Iron Ore Mine

Last updated: November 7, 2013

To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Goldsworthy Iron Ore Mines Extension Project

Last updated: October 9, 2013

The proposal involves extensions to mines at Yarrie and Sunrise Hill, new mines at Nimingarra (Nim I), Cattle Gorge and associated infrastructure such as haul roads and a power line. The proposal also seeks to revise the decommissioning and rehabilitation plan for the entire Goldsworthy operations. Read more...

Turee Syncline Iron Ore Project

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Turee Syncline deposit, located approximately 30 kilometres north-east of Paraburdoo. Read more...

Western Turner Syncline Stage 2 – B1 and Section 17 Deposits

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Western Turner Syncline Stage 2 – B1 and Section 17 deposits, located approximately 30 kilometres west of Tom Price in the central Pilbara Region, Western Australia. Read more...

Mulga Downs Project

Last updated: August 6, 2013

Hancock Prospecting Pty Ltd proposes to develop a new Direct Shipping Ore iron ore mine at Murray's Hill in the Pilbara, and will extract iron ore at a rate of up to 5 million tonnes per annum. Mining is proposed above the water table and no dewatering will be required. The project consists of one mine pit, waste dump, crushing and screening plant, accommodation plant, and associated infrastructure., Note: This proposal is now referred to as the ‘Murray’s Hill Project’ and is a separate... Read more...

Mesa A / Warramboo Iron Ore Project

Last updated: March 27, 2013

The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...

Mesa A / Warramboo Iron Ore Project (s43)

Last updated: March 27, 2013

Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...

Mesa K Remnant Iron Ore Mining Project

Last updated: February 25, 2013

To undertake mining of up to 12 – 13 Mt of remnant iron ore in the previously mined Mesa K deposit to meet the shortfall of dry ore produced from Mesa J. The proposal will utilise the existing Mesa J equipment fleet, personnel and infrastructure. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Hope Downs Iron Ore Mine (s. 46)

Last updated: April 12, 2012

The assessment is an inquiry into conditions of Ministerial Statement 584 , and relates to discharge of water to Weeli Wolli Springs. The original proposal is for the establishment of an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Orebody 24/25 Upgrade Project

Last updated: July 8, 2010

BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...

Balmoral South Iron Ore Project, Cape Preston, WA

Last updated: December 23, 2009

Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...

Pardoo Iron Ore Mine (s. 46)

Last updated: July 20, 2009

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara, as allowed in Ministerial Statement 775 . The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. This assessment is for the proposal under s46 of the EP Act to remove condition 8-1 related to troglofauna sampling. Read more...

Wheelarra Hill Iron Ore Mine Extension

Last updated: November 17, 2006

The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...

Western Extension of Nickol Bay Quarry

Last updated: February 13, 2006

Readymix Holdings Pty Limited proposes to extend its Nickol Bay quarry, located at the southern end of the Burrup Peninsula near Dampier, by an area of approximately 5.2 hectares. Read more...

Orebody 25 Extension

Last updated: January 24, 2006

Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.