This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 5, 2025
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: March 27, 2025
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: April 19, 2024
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: December 15, 2023
Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...Last updated: December 15, 2023
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: January 18, 2023
The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: May 14, 2015
The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...Last updated: October 15, 2014
Fortescue Metals Group Limited (Fortescue) proposes to develop two new mines within the Solomon Project, a greenfield site approximately 60 kilometres (km) north of Tom Price and adjacent to the North Eastern boundary of the Karijini National Park, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway. Read more...Last updated: June 12, 2014
The development of iron ore mines at Deposits ‘A’, ‘B’, and ‘E’, waste dumps, ore processing operation and associated infrastructure at West Angelas, 130 kilometres west of Newman, and rail infrastructure. Inquiry under s46 to amend the conditions of Ministerial Statement 514 . Read more...Last updated: November 7, 2013
To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...Last updated: August 22, 2013
The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Western Turner Syncline Stage 2 – B1 and Section 17 deposits, located approximately 30 kilometres west of Tom Price in the central Pilbara Region, Western Australia. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...