Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (11) Apply Infrastructure filter
  • Industrial (4) Apply Industrial filter
  • Land use (4) Apply Land use filter
  • Power generation (2) Apply Power generation filter
  • Salt (2) Apply Salt filter
  • Iron Ore (1) Apply Iron Ore filter
  • Mineral sands (1) Apply Mineral sands filter

Filter by current status:

  • Ministerial Statement published (17) Apply Ministerial Statement published filter
  • Assessment has been terminated under s40A of the EP Act (2) Apply Assessment has been terminated under s40A of the EP Act filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • Flora and Vegetation (18) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (16) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (14) Apply Social Surroundings filter
  • Terrestrial Fauna (13) Apply Terrestrial Fauna filter
  • 37 (12) Apply 37 filter
  • Benthic Communities and Habitats (9) Apply Benthic Communities and Habitats filter
  • Marine Fauna (8) Apply Marine Fauna filter
  • Coastal Processes (6) Apply Coastal Processes filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Water (2) Apply Water filter
  • Human Health (1) Apply Human Health filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Bunbury Port Authority (1) Apply Bunbury Port Authority filter
  • Coral Coast Marina Development Pty Ltd (1) Apply Coral Coast Marina Development Pty Ltd filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Cristal Pigment Australia Ltd (1) Apply Cristal Pigment Australia Ltd filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Eglinton Estates Pty Ltd (1) Apply Eglinton Estates Pty Ltd filter
  • Esplanade (Mandurah) Pty ltd (1) Apply Esplanade (Mandurah) Pty ltd filter
  • Griffin Electricity Pty Ltd (1) Apply Griffin Electricity Pty Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Griffin Power Pty Ltd (1) Apply Griffin Power Pty Ltd filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Oakajee Port and Rail Pty Ltd (1) Apply Oakajee Port and Rail Pty Ltd filter
  • Pleasant Grove Pty Ltd (1) Apply Pleasant Grove Pty Ltd filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Sheffield Resources (1) Apply Sheffield Resources filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Tiwest Joint Venture Pty Ltd (1) Apply Tiwest Joint Venture Pty Ltd filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter

Filter by region:

  • Pilbara (9) Apply Pilbara filter
  • South West (6) Apply South West filter
  • Perth (4) Apply Perth filter
  • Peel (2) Apply Peel filter
  • Gascoyne (1) Apply Gascoyne filter
  • Kimberley (1) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (2) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (2) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2011 (2) Apply 2011 filter
  • 2005 (2) Apply 2005 filter
  • 2003 (1) Apply 2003 filter
  • 1997 (1) Apply 1997 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Marine Environmental Quality
  4. Hydrological Processes

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Ashburton Salt Project

Last updated: June 13, 2025

K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...

Roy Hill 1 iron ore project port infrastructure proposal (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Thunderbird Mineral Sands Project

Last updated: November 8, 2022

Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...

Eglinton Beach Proposal (s. 46)

Last updated: August 29, 2022

The proposal is for the development of residential, commercial and public open space land uses, a single entrance marina and the management of conservation areas on Lot 5000 and Part Lot 5001 Pipidinny Road and Part Lot 9005 Marmion Ave, Eglinton. The EPA's report on the assessment was published as Bulletin 500, and Ministerial Statement 150 was published on 8 July 1991. In March 2013, Eglinton Estates Pty Ltd wrote to the EPA requesting minor amendments to the existing Implementation... Read more...

Chloride Process Pigment Plant Kemerton and Operations at Australind (S46) [2025]

Last updated: December 6, 2021

Read more...

Mardie Project

Last updated: November 24, 2021

Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North - South Railway (Stage A) (s46) [2231]

Last updated: June 3, 2020

S46 change - Removal of Condition 17: Dust Management Read more...

Special Residential Subdivision Part Murray Locations 109 and 1339 Pleasant Grove Mandurah – Ministerial Statement 297 [S46]

Last updated: August 5, 2019

Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Downstream Processing Chemical Production Facility

Last updated: December 3, 2018

Wesfarmers Chemicals, Energy & Fertilisers Limited  proposes  to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula.     The proposal is adjacent to the  Murujuga  National Park.      The proposal would  result in the  disturbance of  approximately  75 hectares within Site E.     Read more...

Mangles Bay Marine Based Tourist Precinct

Last updated: December 7, 2016

The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...

Bunbury Port Inner Harbour Structure Plan

Last updated: November 22, 2016

The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Last updated: May 1, 2015

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Last updated: February 6, 2014

The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Oakajee Terrestrial Port Development

Last updated: March 14, 2011

The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

Expansion of Collie Power Station (Collie B)

Last updated: October 17, 2005

The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.