This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 8, 2022
Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...Last updated: October 24, 2022
The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...Last updated: August 29, 2022
The proposal is for the development of residential, commercial and public open space land uses, a single entrance marina and the management of conservation areas on Lot 5000 and Part Lot 5001 Pipidinny Road and Part Lot 9005 Marmion Ave, Eglinton. The EPA's report on the assessment was published as Bulletin 500, and Ministerial Statement 150 was published on 8 July 1991. In March 2013, Eglinton Estates Pty Ltd wrote to the EPA requesting minor amendments to the existing Implementation... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 21, 2022
Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: March 21, 2022
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...